TRANSOCKET CONFIGURATIONS AND<br />

CONNECTION DETAILS (CONTINUED)<br />

FIGURE 5-C<br />

Integrity of Connections- When<br />

installing conductors in transockets, it is<br />

the responsibility of the installer to<br />

ensure that all line and load connections<br />

are tight, including the connections<br />

between the CT bus bar and the<br />

connector.<br />

Transocket- Overhead Service<br />

1. For overhead installations, line<br />

conductors must enter the<br />

transocket’s top, top back, or top<br />

sides and connect to transocket’s top<br />

terminals.<br />

2. Load conductors must connect to the<br />

transocket’s bottom terminals and<br />

exit through the transocket’s bottom,<br />

bottom back, or bottom sides.<br />

Transocket- Underground Service<br />

Permissible Entrance and Exit Locations<br />

For Transocket Conductors<br />

1. For underground installations, line<br />

conductors must enter through the<br />

transocket’s bottom, bottom back, or<br />

bottom sides and connect to the<br />

transocket’s bottom terminals.<br />

2. Load conductors must connect to the<br />

transocket’s top terminals and exit<br />

through the top, top back, or top<br />

sides.<br />

3. Reserve adequate space beneath<br />

the transocket for service raceway.<br />

Copyright 2010 Oncor Electric Delivery Company. All rights reserved<br />