600V CABLE TEST REPORT<br />

CHECK LIST<br />

1. Check exposed cable for physical damage.<br />

2. Check terminations of exposed cable where applicable.<br />

3. Observe ground lead of insulation tester to be solidly connected to grounding source. Re-check continuity of ground lead to source each<br />

time ground lead is moved.<br />

4. Check cable tested for size, type, phasing, wire tags and terminations per plans, specifications and wiring diagrams.<br />

Please list discrepancies noted on above items.<br />

COMMENTS<br />

T:\specs\<strong>Well</strong> Sites -Elect <strong>Package</strong>\Re<strong>Bid</strong> 05.2012\Div 26 Electrical\26 01 26.01 600 VOLT CABLE TEST.doc<br />

Page 2 of 2