and be compatible with the design concept of the completed<br />

Project as a functioning whole as indicated by the Contract<br />

Documents.<br />

2. ENGINEER’s review and approval will not<br />

extend to means, methods, techniques, sequences, or<br />

procedures of construction (except where a particular<br />

means, method, technique, sequence, or procedure of construction<br />

is specifically and expressly called for by the<br />

Contract Documents) or to safety precautions or programs<br />

incident thereto. The review and approval of a separate<br />

item as such will not indicate approval of the assembly in<br />

which the item functions.<br />

3. ENGINEER’s review and approval of Shop<br />

Drawings or Samples shall not relieve CONTRACTOR<br />

from responsibility for any variation from the requirements<br />

of the Contract Documents unless CONTRACTOR<br />

has in writing called ENGINEER’s attention to each such<br />

variation at the time of each submittal as required by<br />

paragraph 6.17.D.3 and ENGINEER has given written<br />

approval of each such variation by specific written<br />

notation thereof incorporated in or accompanying the<br />

Shop Drawing or Sample approval; nor will any approval<br />

by ENGINEER relieve CONTRACTOR from<br />

responsibility for complying with the requirements of<br />

paragraph 6.17.D.1.<br />

F. Resubmittal Procedures<br />

1. CONTRACTOR shall make corrections required<br />

by ENGINEER and shall return the required number of<br />

corrected copies of Shop Drawings and submit as required<br />

new Samples for review and approval. CONTRACTOR<br />

shall direct specific attention in writing to revisions other<br />

than the corrections called for by ENGINEER on previous<br />

submittals.<br />

6.18 Continuing the Work<br />

A. CONTRACTOR shall carry on the Work and adhere<br />

to the progress schedule during all disputes or disagreements<br />

with OWNER. No Work shall be delayed or postponed<br />

pending resolution of any disputes or disagreements, except<br />

as permitted by paragraph 15.04 or as OWNER and<br />

CONTRACTOR may otherwise agree in writing.<br />

6.19 CONTRACTOR’s General Warranty and Guarantee<br />

A. CONTRACTOR warrants and guarantees to<br />

OWNER, ENGINEER, and ENGINEER’s Consultants that<br />

all Work will be in accordance with the Contract Documents<br />

and will not be defective. CONTRACTOR’s warranty and<br />

guarantee hereunder excludes defects or damage caused by:<br />

1. abuse, modification, or improper maintenance or<br />

operation by persons other than CONTRACTOR, Subcontractors,<br />

Suppliers, or any other individual or entity for<br />

whom CONTRACTOR is responsible; or<br />

2. normal wear and tear under normal usage.<br />

B. CONTRACTOR’s obligation to perform and complete<br />

the Work in accordance with the Contract Documents shall be<br />

absolute. None of the following will constitute an acceptance<br />

of Work that is not in accordance with the Contract<br />

Documents or a release of CONTRACTOR’s obligation to<br />

perform the Work in accordance with the Contract Documents:<br />

1. observations by ENGINEER;<br />

2. recommendation by ENGINEER or payment by<br />

OWNER of any progress or final payment;<br />

3. the issuance of a certificate of Substantial<br />

Completion by ENGINEER or any payment related<br />

thereto by OWNER;<br />

4. use or occupancy of the Work or any part thereof<br />

by OWNER;<br />

so;<br />

5. any acceptance by OWNER or any failure to do<br />

6. any review and approval of a Shop Drawing or<br />

Sample submittal or the issuance of a notice of acceptability<br />

by ENGINEER;<br />

7. any inspection, test, or approval by others; or<br />

8. any correction of defective Work by OWNER.<br />

6.20 INDEMNIFICATION<br />

A. TO THE FULLEST EXTENT PERMITTED BY<br />

LAWS AND REGULATIONS, CONTRACTOR SHALL<br />

INDEMNIFY AND HOLD HARMLESS OWNER,<br />

ENGINEER, ENGINEER’S CONSULTANTS, AND THE<br />

OFFICERS, DIRECTORS, PARTNERS, EMPLOYEES,<br />

AGENTS, AND OTHER CONSULTANTS AND<br />

SUBCONTRACTORS OF EACH AND ANY OF THEM<br />

FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES,<br />

AND DAMAGES (INCLUDING BUT NOT LIMITED TO<br />

ALL FEES AND CHARGES OF ENGINEERS,<br />

ARCHITECTS, ATTORNEYS, AND OTHER<br />

PROFESSIONALS AND ALL COURT OR ARBITRATION<br />

OR OTHER DISPUTE RESOLUTION COSTS) ARISING<br />

OUT OF OR RELATING TO THE PERFORMANCE OF<br />

THE WORK, PROVIDED THAT ANY SUCH CLAIM,<br />

COST, LOSS, OR DAMAGE:<br />