25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 26 05 29<br />

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS<br />

PART 1 GENERAL<br />

1.1 Work Included<br />

A. Furnish labor, materials, equipment and incidentals necessary to install hangers and<br />

supports for electrical equipment and systems. Electrical work shall be in accordance<br />

with Section 26 05 00, “Common Work Results for Electrical”.<br />

1.2 PERFORMANCE REQUIREMENTS<br />

A. Design supports for multiple raceways capable of supporting combined weight of<br />

supported systems and its contents.<br />

B. Design equipment supports capable of supporting combined operating weight of<br />

supported equipment and connected systems and components.<br />

1.3 SUBMITTALS<br />

A. Submittals shall be in accordance with Section 01 33 00, “Submittal Procedures” and<br />

shall include Record Data.<br />

1.4 QUALITY ASSURANCE<br />

A. Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural<br />

Welding Code - Steel."<br />

B. Comply with NFPA 70.<br />

1.5 COORDINATION<br />

A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases.<br />

Concrete, reinforcement, and formwork requirements are specified in Division 03.<br />

PART 2 PRODUCTS<br />

2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS<br />

A. Steel Slotted Support Systems: Comply with MFMA-4, factory-fabricated components<br />

for field assembly.<br />

1. Manufacturers: Subject to compliance with requirements, provide products by<br />

one of the following:<br />

a. Allied Tube & Conduit.<br />

b. Cooper B-Line, Inc.; a division of Cooper Industries.<br />

c. ERICO International Corporation.<br />

d. GS Metals Corp.<br />

e. Thomas & Betts Corporation.<br />

May 18, 2012<br />

Hangers and Supports for Electrical Systems<br />

Revision 0 26 05 29-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!