Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

3. Motor Starting Study<br />

a. Contractor shall coordinate with the motor manufacturer and the Soft<br />

Starter & VFD manufacturers for all data required to perform the motor<br />

starting analysis. The preliminary starting analysis shall determine the<br />

maximum inrush allowed when starting the motor to not drop out the<br />

loads under the worst operating conditions.<br />

4. Arc Flash Hazard Analysis<br />

a. Provide a color copy of project specific Arc Flash labels for each<br />

panelboard, switchboard, switchgear, disconnect, Motor Control Center,<br />

VFDs, starters, transfer switches, including all existing electrical<br />

equipment – switchgear, starters, motor control center, panelboards,<br />

starters, etc.<br />

b. Provide a copy of the one-line diagram color-coded to show the incident<br />

ranges & clothing classifications at each bus. The one-line shall be on<br />

11x17 paper and shall be separated out across three (3)-11x17 sheets.<br />

1) Provide a table indicating the color coding used for each incident<br />

range & clothing classification. The one-line shall also include<br />

the information specified in section 2.03 below. The following<br />

is a recommended color coding for the following Hazard/Risk<br />

Category numbers:<br />

a) Green to indicate a Category 0<br />

b) Blue to indicate a Category 1<br />

c) Brown to indicate a Category 2<br />

d) Yellow to indicate a Category 3<br />

e) Orange to indicate a Category 4<br />

f) Red to indicate Above a Category 4<br />

B. Provide six (6) bound color copies of the completed studies to be submitted to the<br />

ENGINEER for approval. Each hard copy of studies shall be bound in a 3-ring binder.<br />

C. After the report and one-line has been approved, provide a color copy in PDF format of<br />

the finalized 11x17 one-line diagram to the Contractor for the Contractor’s use to frame<br />

in the electrical room as specified in section 26 05 00, “Common Work Results for<br />

Electrical”. The one-line shall reflect all changes made including but not limited to<br />

changes made during construction<br />

D. The Contractor shall redo the Power System Studies if any changes are made during the<br />

field testing checkout and/or start-up. The Contractor shall submit the Power System<br />

Studies for Engineer Approval. The Studies shall include an updated copy of the color<br />

copy Arc Flash Labels.<br />

E. A CD with all SKM input files and a PDF of all output files is required for both the<br />

preliminary and final power system studies submittals.<br />

1. Two Software copies of actual power systems computer program project data<br />

files burned in on a CD. The CONTRACTOR shall provide an electronic copy<br />

on a CD-ROM of all files used to develop the electrical system model in the<br />

power system analysis program and all files for the written study analysis and<br />

summary data tables. For instance if SKM software is used for the power system<br />

studies, then the SKM files shall be burned in on a CD-ROM and provided to the<br />

OWNER/ENGINEER. This shall include any library files used for circuit<br />

breakers, fuses, etc. for the power system analysis.<br />

May 18, 2012<br />

Electrical Power System Studies<br />

Revision 0 26 05 73.01-4