Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 26 05 73.01<br />

ELECTRICAL POWER SYSTEM STUDIES<br />

PART 1 GENERAL<br />

1.1 DESCRIPTION<br />

General: This section specifies that the CONTRACTOR prepare a short circuit and protective<br />

device coordination study, load flow and motor starting study, and an arc flash hazard analysis for<br />

the electrical power system as shown on the plans for each <strong>Well</strong> Site.<br />

NO EQUIPMENT IS TO BE ENERGIZED UNTIL THE POWER SYSTEM STUDIES<br />

HAVE BEEN APPROVED BY THE ENGINEER, THE PROTECTIVE RELAYS AND<br />

BREAKERS HAVE BEEN SET PER THE SHORT CIRCUIT AND RELAY<br />

COORDINATION STUDY AND THE ARC FLASH LABELS HAVE BEEN INSTALLED<br />

ON THE EQUIPMENT. NO EXCEPTIONS.<br />

Short Circuit and Protective Device Coordination Study, Arc Flash Analysis, Load Flow<br />

Study, and Motor Starting Study<br />

The studies shall provide an evaluation of the electrical power system and the model numbers and<br />

settings of the protective relays or devices and metering or motor monitoring devices for setting<br />

by the CONTRACTOR. The Studies shall include settings for all protective relays and electric<br />

system monitoring. The Contractor shall obtain any needed data or information for the electrical<br />

equipment from Contract Documents, various suppliers, and from conducting his own field<br />

investigations.<br />

A. Scope:<br />

1. The CONTRACTOR is responsible for providing all pertinent information<br />

necessary for the successful completion of the Short Circuit and Relay<br />

Coordination Study, Load Flow and Motor Starting Study, and Arc Flash<br />

Analysis. All cable and raceway data, data from all new Switchgear, motor<br />

control centers, transformers, panelboards, and separately mounted fuses, starters<br />

or circuit breakers shall be obtained by the CONTRACTOR. Obtain all existing<br />

or new protective device information to include all present settings. The<br />

CONTRACTOR shall obtain any needed data or information from Contract<br />

Documents, various suppliers, the Electric Utility and from conducting his own<br />

field investigations. The data obtained shall be organized and submitted to the<br />

ENGINEER to show that all the necessary data gathering work has been done.<br />

2. Calculations shall utilize actual X/R and three phase short circuit values obtained<br />

by the CONTRACTOR from the Electric Utility. The use of infinite bus fault<br />

current calculation is not acceptable.<br />

May 18, 2012<br />

Electrical Power System Studies<br />

Revision 0 26 05 73.01-1