D. Provide Samples for comparison with products delivered to the Site for use on the Project.<br />

1. Samples shall be of sufficient size and quantity to clearly illustrate the functional<br />

characteristics of the product, with integrally related parts and attachment devices.<br />

2. Indicate the full range of color, texture, and patterns.<br />

3. Dispose of Samples when related Work has been completed and approved, and disposal<br />

is requested by the Engineer. At Owner's option Samples will become the property of<br />

the Owner.<br />

E. Construct mock-ups for comparison with the Work being performed.<br />

1. Construct mock-ups of the size or area indicated in the detailed Specifications.<br />

2. Construct mock-ups complete with texture and finish to represent the finished product.<br />

3. Protect mock-ups until Work has been completed and accepted by the Owner.<br />

4. Dispose of mock-ups when related Work has been completed and disposal is approved<br />

by the Engineer.<br />

F. Submit Operation and Maintenance manuals (O&M) for all equipment, mechanical devices,<br />

or components described in the Contract Documents per Section 01 78 23, Operation And<br />

Maintenance Data. Include copies of approved Shop Drawings in the manual.<br />

G. Submit Request for Information (RFI) in accordance with Section 01 31 13, Project<br />

Coordination.<br />

H. Submit a Schedule of Values and Application for Payment (AP) in accordance with Section<br />

01130, Payment Procedures.<br />

I. Submit Progress Schedules (SCH) in accordance with Section 01 32 16 <strong>Construction</strong> Progress<br />

Schedules.<br />

J. Submit Certified Test Reports (CTR) from independent testing laboratories in accordance<br />

with Section 01 40 00, Quality Requirements.<br />

1. Submit test reports for material fabricated for this project with Shop Drawings for that<br />

product.<br />

2. Submit test reports produced at the point of production for standard production<br />

products with the record data for that product.<br />

K. Submit Equipment Installation Reports (EIR) in accordance with Section 01 75 00, Starting<br />

And Adjusting.<br />

L. Submit Notifications by <strong>Bid</strong>der (NBC) in accordance with Section 01 31 13, Project<br />

Coordination.<br />

M. Submit Process Performance Bonds (PPB) in accordance with Section 00 73 00,<br />

Supplementary Conditions and the detailed equipment specifications. These bonds will not<br />

be required until notified by the CMAR.<br />

1.07 REQUESTS FOR DEVIATION<br />

A. Submit requests for deviation from the Contract Documents for any product that does not<br />

fully comply with the Contract Documents.<br />

B. Submit request by Contract Modification Request (CMR) per Section 01 31 13, Project<br />

Coordination. Identify the deviations and the reason the change is requested.<br />

Submittal Procedures – <strong>Bid</strong> <strong>Package</strong> #8 01 33 00-7<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />