25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6. Substitutions or "equivalent" Items<br />

A. The Contract, if awarded, will be on the basis of materials and equipment described in the<br />

Drawings or specified in the Specifications without consideration of possible substitute or "orequivalent"<br />

items. Whenever it is indicated in the Drawings or specified in the Specification<br />

that a substitute or "or-equivalent" item of material or equipment may be furnished or used by<br />

<strong>Bid</strong>der if acceptable to Engineers/CMAR, application for such acceptance will not be<br />

considered by Engineers/CMAR until after the Effective Date of the Agreement unless the<br />

Engineers/CMAR at their option, elect to issue an Addenda naming a substitute or "orequivalent"<br />

item prior to receipt of bids. For EQUIPMENT PROPOSALS only the<br />

Manufacturers listed in the Specifications will be accepted. The procedure for submission of<br />

any such application by <strong>Bid</strong>der and consideration by Engineers/CMAR as set forth in<br />

Paragraph 6.05 of the General Conditions and in CMAR’s Specification Section 01 33 00,<br />

Submittal Procedures.<br />

7. <strong>Bid</strong> Form<br />

A. All blanks on the <strong>Bid</strong> Form must be completed in ink or by typewriter. <strong>Bid</strong>der shall indicate<br />

with “N/A” any <strong>Bid</strong> <strong>Package</strong>s not being proposed on.<br />

B. <strong>Bid</strong>s by corporations must be executed in the corporate name by the president or a vicepresident<br />

(or other corporate officer accompanied by evidence of authority to sign) and the<br />

corporate seal must be affixed and attested by the secretary or an assistant secretary. The<br />

corporate address and state of incorporation must be shown below the signature.<br />

C. <strong>Bid</strong>s by partnerships must be executed in the partnership name signed by a partner, whose<br />

title must appear under the signature and the official address of the partnership must be<br />

shown below the signature.<br />

D. All names must be typed or printed below the signature.<br />

E. The <strong>Bid</strong> shall contain an acknowledgment of receipt of all Addenda (the numbers of which<br />

must be filled in on the <strong>Bid</strong> Form).<br />

F. The address and telephone number for communications regarding the <strong>Bid</strong> must be shown.<br />

G. <strong>Bid</strong>s must be priced as indicated on the <strong>Bid</strong> Form for the <strong>Bid</strong> <strong>Package</strong>s as applicable to the<br />

<strong>Bid</strong>der. If applicable the price of the alternative bids for each <strong>Bid</strong> <strong>Package</strong> will be the amount<br />

to be added to or deducted from the price of the <strong>Package</strong>’s Base <strong>Bid</strong> if the alternate is<br />

selected.<br />

8. Submission of <strong>Bid</strong>s<br />

A. Submission of <strong>Bid</strong> shall include:<br />

1. <strong>Bid</strong> Proposal <strong>Package</strong><br />

2. Attachment A – <strong>Bid</strong> Proposal<br />

3. Attachment B – <strong>Bid</strong>der’s Profile<br />

4. Attachment C – <strong>Bid</strong>der’s Statement of Experience.<br />

5. Attachment D – Subcontractor’s Safety Performance Questionnaire.<br />

6. Attachment E - <strong>Bid</strong>der’s Scope of Work/Supply.<br />

7. Attachment F – List of Subcontractors<br />

8. Attachment G – List of Suppliers<br />

Instructions To <strong>Bid</strong>ders – <strong>Bid</strong> <strong>Package</strong> #8<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong> 00 10 00 - 3<br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!