1. IS ATTRIBUTABLE TO BODILY INJURY,<br />

SICKNESS, DISEASE, OR DEATH, OR TO INJURY<br />

TO OR DESTRUCTION OF TANGIBLE PROPERTY<br />

(OTHER THAN THE WORK ITSELF), INCLUDING<br />

THE LOSS OF USE RESULTING THEREFROM; AND<br />

2. IS CAUSED IN WHOLE OR IN PART BY ANY<br />

NEGLIGENT ACT OR OMISSION OF CONTRACTOR,<br />

ANY SUBCONTRACTOR, ANY SUPPLIER, OR ANY<br />

INDIVIDUAL OR ENTITY DIRECTLY OR INDIRECT-<br />

LY EMPLOYED BY ANY OF THEM TO PERFORM<br />

ANY OF THE WORK OR ANYONE FOR WHOSE<br />

ACTS ANY OF THEM MAY BE LIABLE,<br />

REGARDLESS OF WHETHER OR NOT CAUSED IN<br />

PART BY ANY NEGLIGENCE OR OMISSION OF AN<br />

INDIVIDUAL OR ENTITY INDEMNIFIED<br />

HEREUNDER OR WHETHER LIABILITY IS IMPOSED<br />

UPON SUCH INDEMNIFIED PARTY BY LAWS AND<br />

REGULATIONS REGARDLESS OF THE<br />

NEGLIGENCE OF ANY SUCH INDIVIDUAL OR<br />

ENTITY.<br />

B. IN ANY AND ALL CLAIMS AGAINST OWNER<br />

OR ENGINEER OR ANY OF THEIR RESPECTIVE<br />

CONSULTANTS, AGENTS, OFFICERS, DIRECTORS,<br />

PARTNERS, OR EMPLOYEES BY ANY EMPLOYEE (OR<br />

THE SURVIVOR OR PERSONAL REPRESENTATIVE OF<br />

SUCH EMPLOYEE) OF CONTRACTOR, ANY<br />

SUBCONTRACTOR, ANY SUPPLIER, OR ANY<br />

INDIVIDUAL OR ENTITY DIRECTLY OR INDIRECTLY<br />

EMPLOYED BY ANY OF THEM TO PERFORM ANY OF<br />

THE WORK, OR ANYONE FOR WHOSE ACTS ANY OF<br />

THEM MAY BE LIABLE, THE INDEMNIFICATION<br />

OBLIGATION UNDER PARAGRAPH 6.20.A SHALL NOT<br />

BE LIMITED IN ANY WAY BY ANY LIMITATION ON<br />

THE AMOUNT OR TYPE OF DAMAGES,<br />

COMPENSATION, OR BENEFITS PAYABLE BY OR FOR<br />

CONTRACTOR OR ANY SUCH SUBCONTRACTOR,<br />

SUPPLIER, OR OTHER INDIVIDUAL OR ENTITY<br />

UNDER WORKERS’ COMPENSATION ACTS,<br />

DISABILITY BENEFIT ACTS, OR OTHER EMPLOYEE<br />

BENEFIT ACTS.<br />

C. The indemnification obligations of CONTRACTOR<br />

under paragraph 6.20.a shall not extend to the liability of<br />

ENGINEER and ENGINEER’S consultants or to the officers,<br />

directors, partners, employees, agents, and other consultants<br />

and subcontractors of each and any of them arising out of:<br />

1. The preparation or approval of, or the failure to<br />

prepare or approve, maps, drawings, opinions, reports,<br />

surveys, change orders, designs, or specifications; or<br />

2. Giving directions or instructions, or failing to<br />

give them, if that is the primary cause of the injury or<br />

damage.<br />

ARTICLE 7 - OTHER WORK<br />

7.01 Related Work at Site<br />

A. OWNER may perform other work related to the<br />

Project at the Site by OWNER’s employees, or let other direct<br />

contracts therefor, or have other work performed by utility<br />

owners. If such other work is not noted in the Contract<br />

Documents, then:<br />

1. written notice thereof will be given to CON-<br />

TRACTOR prior to starting any such other work; and<br />

2. if OWNER and CONTRACTOR are unable to<br />

agree on entitlement to or on the amount or extent, if any,<br />

of any adjustment in the Contract Price or Contract Times<br />

that should be allowed as a result of such other work, a<br />

Claim may be made therefor as provided in paragraph<br />

10.05.<br />

B. CONTRACTOR shall afford each other contractor<br />

who is a party to such a direct contract and each utility owner<br />

(and OWNER, if OWNER is performing the other work with<br />

OWNER’s employees) proper and safe access to the Site and<br />

a reasonable opportunity for the introduction and storage of<br />

materials and equipment and the execution of such other<br />

work and shall properly coordinate the Work with theirs.<br />

Unless otherwise provided in the Contract Documents, CON-<br />

TRACTOR shall do all cutting, fitting, and patching of the<br />

Work that may be required to properly connect or otherwise<br />

make its several parts come together and properly integrate<br />

with such other work. CONTRACTOR shall not endanger<br />

any work of others by cutting, excavating, or otherwise<br />

altering their work and will only cut or alter their work with<br />

the written consent of ENGINEER and the others whose work<br />

will be affected. The duties and responsibilities of<br />

CONTRACTOR under this paragraph are for the benefit of<br />

such utility owners and other contractors to the extent that<br />

there are comparable provisions for the benefit of<br />

CONTRACTOR in said direct contracts between OWNER<br />

and such utility owners and other contractors.<br />

C. If the proper execution or results of any part of<br />

CONTRACTOR’s Work depends upon work performed by<br />

others under this Article 7, CONTRACTOR shall inspect<br />

such other work and promptly report to ENGINEER in<br />

writing any delays, defects, or deficiencies in such other work<br />

that render it unavailable or unsuitable for the proper<br />

execution and results of CONTRACTOR’s Work.<br />

00700 - 26