Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

3. Complete interconnection and point to point wiring diagrams in AutoCAD format<br />

for all field control and instrumentation wiring between instruments, electrical<br />

equipment, starters, VFDs, etc.. A hard copy shall be submitted to the Engineer<br />

for approval prior to the final AutoCAD files being submitted.<br />

Interconnection/wiring diagrams shall include cable numbers, wire tags, actual<br />

equipment terminal strip numbers, etc.<br />

4. Operation and maintenance manuals shall contain the shop drawings, submittals,<br />

spare part lists, schematics, final wiring diagrams with any changes made during<br />

start-up and maintenance procedures.<br />

5. Unless other additional information is required by the detailed equipment<br />

specifications, the following information shall be included for motors:<br />

a. Motor identification number and nomenclature as specified<br />

b. Make and motor type<br />

c. Brake horsepower of the motor<br />

d. Locked rotor current at full load<br />

e. Motor efficiency at full load (3-phase motors only)<br />

f. Starting torque<br />

g. Method of insulating and impregnating motor coils (3-phase only)<br />

h. Speed of the motor at full torque<br />

i. Full load current<br />

j. Service factor<br />

k. Motor temperature rise measured by resistance over 40 degrees C ambient<br />

6. The Contractor shall provide a monthly report to the Owner/Engineer for review<br />

stating that the Master Electrician has been to the job site and thoroughly<br />

reviewed the work. The report shall be signed by the Master Electrician and<br />

include the data and time the Master Electrician was on site.<br />

a. The CONTRACTOR shall submit a copy of the Master electrician’s<br />

license and Journeyman’s license who will be working on the project.<br />

This information shall be submitted as a formal submittal prior to<br />

beginning any work.<br />

7. The Contractor shall:<br />

a. Prepare, and keep up-to-date, the Record Drawings and detailed<br />

construction drawings;<br />

b. Record the exact locations of each of these differences, sizes and details<br />

of the <strong>Construction</strong> Work as executed, with cross-references to and other<br />

requirements on the Record Drawings.<br />

c. Keep the Record Drawings on the Work Site;<br />

d. Upon completion of the Work, or at such other time as may be determined<br />

by the Engineer, submit the Record Drawings and copies to the Owner’s<br />

Representative in accordance with the Owner’s Requirements.<br />

e. Underground Interference drawing showing all underground duct banks,<br />

ground rods, ground conductors, pipes, piers, vaults, manholes, pull<br />

boxes, etc. that clearly identifies the location and routing of these systems.<br />

All interferences shall be brought to the Engineer’s attention.<br />

f. Provide revised drawings in AutoCAD noting any changes made to<br />

equipment during start-up.<br />

May 18, 2012<br />

Common Work Results for Electrical<br />

Revision 0 26 05 00-2