Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 22 10 00<br />

PLUMBING AND PIPING<br />

PART 1 GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Pipe and pipe fittings.<br />

2. Piping specialties.<br />

B. Related Work:<br />

1. Division 01 - General Requirements<br />

2. Section 22 05 00 - Plumbing Identification<br />

C. References<br />

1. ASTM A53/A53M<br />

2. American Water Works Association (AWWA) C-205 - Standard for Cement-<br />

Mortar Protective Lining and Coating for Steel Water Pipe―4 In. (100 mm) and<br />

Larger―Shop-Applied<br />

3. AWWA C900: AWWA Standard for Polyvinyl Chloride (PVC) Pressure Pipe<br />

and Fabricated Fittings, 4 In. Through 12 In. (100 mm Through 300 mm), for<br />

Water Transmission and Distribution<br />

4. AWWA C210: AWWA Standard for Liquid-Epoxy Coating Systems for the<br />

Interior and Exterior of Steel Water Pipelines<br />

5. AWWA C601: AWWA Standard for Disinfecting Water Mains<br />

6. AWWA Manual of Water Supply Practices M23: PVC Pipe - Design and<br />

Installation<br />

1.2 SUBMITTALS<br />

A. Product Data: Submit manufacturers catalog information with sizes, capacities, and<br />

finishes.<br />

B. Manufacturer's Installation Instructions: Submit installation instructions for material and<br />

equipment.<br />

C. Manufacturer's Certificate: Certify products meet or exceed specified requirements.<br />

D. Coatings:<br />

1. Manufacturer's color charts and product data for each proposed coating system.<br />

2. Reference samples showing the color and texture of the final paint to be applied.<br />

3. Letter from the Coatings Manufacturer approving and endorsing Coatings<br />

Installer.<br />

May 18, 2012<br />

Plumbing and Piping<br />

Revision 0 22 10 00 - 1