OVERHEAD SERVICE ATTACHMENTS<br />

FIGURE 3-B<br />

NOTES:<br />

1. Customer installs service drop attachment of adequate strength for attachment of<br />

Company’s service drop conductors.<br />

2. Screw-in type service attachments are not allowed.<br />

3. Service mast supporting service drop to be minimum 2” rigid steel or 2 ½” IMC<br />

conduit with no coupling above top conduit clamp. EMT is not acceptable for service<br />

mast.<br />

4. See Figure 3-I, page 29 for 3 wire delta services.<br />

Copyright 2010 Oncor Electric Delivery Company. All rights reserved<br />