“4.02.A.3 Copies of these reports and Drawings may be downloaded at the Project<br />

website when available. These reports and Drawings are not part of the Contract<br />

Documents, but the technical data contained therein upon which the <strong>Bid</strong>der is entitled to<br />

rely as provided in GC‐4.02B and as identified and established above are incorporated<br />

therein by reference. <strong>Bid</strong>der is not entitled to rely upon other information and data<br />

utilized by Engineer and Engineer's Consultants in preparation of Drawings and<br />

Specifications.”<br />

SC‐4.03 Make the following modifications to 4.03 Differing Subsurface or Physical Conditions.<br />

A. Amend paragraph 4.03 A. by deleting “promptly” and inserting “within three (3) days.”<br />

SC‐4.04 Make the following modifications to 4.04 Underground Facilities.<br />

A. Amend the first sentence of paragraph 4.04 B.1.as follows:<br />

“......accuracy in the Contract Documents, <strong>Bid</strong>der shall, within three days after becoming<br />

aware thereof ......”<br />

B. Amend the second sentence of paragraph 4.04 B.2.as follows:<br />

“An equitable adjustment shall be made in the Contract Price or Contract Times, or both,<br />

to the extent ....”<br />

SC‐4.06 Make the following modifications to 4.06 Hazardous Environmental Conditions at Site<br />

A. Amend paragraph 4.06 G. by changing reference to paragraph 4.06 E. to paragraph 4.06 G.<br />

B. Amend paragraph 4.06 H. by changing reference to paragraph 4.06 F. to paragraph 4.06 H.<br />

SC‐5.01 Make the following modifications to 5.01 Performance, Payment and Other Bonds<br />

A. Amend paragraph 5.01 A. by deleting “These Bonds shall remain in effect at least until one<br />

year after the date.” and adding the following:<br />

The Maintenance Bond shall remain in effect at least until 2 years after that date.”<br />

B. Add new paragraphs immediately after paragraph 5.01C<br />

“D. Amounts owed by Owner/CMAR to <strong>Bid</strong>der under the Contract shall be used for the<br />

performance of the Contract and to satisfy claims, if any, under any performance bond or<br />

payment bond. By <strong>Bid</strong>der furnishing and Owner/CMAR accepting these bonds, they agree<br />

that all funds earned by <strong>Bid</strong>der in the performance of the Contract are dedicated to satisfy<br />

Supplementary Conditions (Revised per <strong>Garney</strong>)<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project - Pump Stations 00 73 00 - 7<br />

12/28/2011