3.00 EXECUTION<br />

3.01 INSTALLATION<br />

A. All work shall be in accordance with manufacturer’s recommended practices. Care shall be<br />

exercised to avoid damage to equipment during installation. Damaged equipment shall be<br />

replaced by Contractor at no expense to the Owner.<br />

B. System equipment shall be installed where indicated in the Contract Documents. Power<br />

and signal connections between components shall provide the specified functions. Install<br />

according to equipment manufacturer's instruction.<br />

C. The system Supplier Contractor shall utilize their own printers, monitors, and computers for<br />

programming, testing, and start-up. The use of the OWNER's computers, monitors, or<br />

printers shall not be acceptable until the entire system has been installed, debugged,<br />

programmed, and operated to ENGINEER's satisfaction.<br />

3.02 PROGRAMMING<br />

A. The loop descriptions and diagrams shown in the Contract Documents are functional only<br />

and do not attempt to specify detail program coding that may be required. The<br />

CONTRACTOR shall utilize this functional information to develop complete application<br />

programming for the PLC equipment provided under this CONTRACT. Programs shall be<br />

designed to provide fail-safe operation of equipment in case of PC logic or power supply<br />

failure. Fail-safe shall be defined as "stopped" for all drives and "closed" for valves, unless<br />

otherwise specified. Up to fifty (50) graphic pages shall be required for the operatorinterface,<br />

and will be developed via a menu-driven color graphics editor. Interrupting logic<br />

between the PLC and central computer system shall be required as per system sequence of<br />

operation. An additional 15 graphics shall be developed in the field in coordination with the<br />

OWNER and the ENGINEER. The graphics shall be sufficiently detailed to include all<br />

equipment, pipes, valves, solenoids, meters, switches, etc. Graphics shall include<br />

equipment tag numbers and display the current flow rates, levels, quantities, status,<br />

elapsed time of equipment, etc. All such work shall be done at no extra cost to the OWNER.<br />

Before programming the graphics, the CONTRACTOR shall furnish a set of drawings for<br />

ENGINEER’S AND OWNER’S review.<br />

3.03 DOCUMENTATION<br />

A. Following delivery to the site, the equipment manufacturer, in the presence of the<br />

ENGINEER, shall demonstrate operation of the complete system.<br />

B. The CONTRACTOR shall provide documentation for all application software.<br />

Documentation system shall be diagrams in ladder-rung format, and shall show all input<br />

devices to the left of the left "power rail" and all outputs to the right of the right "power<br />

rail." The diagrams shall show all device codes and functional description used in the<br />

project manual, and shall also show PLC address codes, element codes, and I/O assembly<br />

codes, modules numbers, and terminal numbers.<br />

Supervisory Control and Data Acquisition (SCADA) System 40 90 02-26<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS