F. Operation and Maintenance Manuals<br />

1. Operating instructions shall incorporate a functional description of the entire system<br />

including the system schematics which reflect "as-built" modifications. Wiring diagrams<br />

shall be furnished as a part of the Operation and Maintenance Manuals which clearly<br />

show terminal numbers and wire numbers as they actually are in the instrumentation<br />

system. Instrument panel wiring shall be such that each wire installed has its own<br />

number designation at each end and such that no number is repeated. Instrument<br />

panel wire tagging instructions as specified in Section 26 05 19, “Low Voltage Electrical<br />

Power Conductors and Cables” shall be followed.<br />

2. Special maintenance requirements particular to the system shall be clearly defined<br />

along with special calibration and test procedures.<br />

3. A schedule defining all I/O, database reference, and point of origin or destination, and<br />

PLC system internal address.<br />

4. Submit written description of functions, loops, and logic.<br />

5. Submit all SAMA Logic and Wiring Diagrams and ISA Logic Diagrams for all equipment<br />

requiring programming at the PLCs, with all set points and ranges indicated.<br />

6. One software copy of actual program files burned on a CD/DVD with a PDF copy of<br />

program with descriptions and rung comments.<br />

7. Provide hardcopy of PLC programming logic in O&M Manuals.<br />

8. Provide a hard copy of the “as-built” “as-built” wiring diagrams, panel layout,<br />

elevations, sections, details, and associated drawings in a separate binder.<br />

9. One PDF copy and one AutoCAD (.dwg) copy of the “as-built” wiring diagrams, panel<br />

layout, elevations, sections, details, and associated drawings burned on a CD.<br />

a. Maximum file size is 5MB. If manual is greater than maximum allowable file size,<br />

provide individual files for each major section of manual.<br />

b. All files shall be compatible with the latest software version available.<br />

c. Filename shall identify the plant site, plant area, equipment manufacturer, and date<br />

equipment placed in service. i.e. WWTP-PC1-Manufacturer-200503.pdf.<br />

d. Provide a master Table of Contents which includes links to navigate to all the files<br />

on the CD. The chapter labels shall identify the information included in that chapter<br />

as well as its file name, i.e.: RTU Panel Layout.<br />

e. Each PDF file shall contain a table of contents at the beginning of the file which<br />

includes hypertext links or bookmarks to navigate the file contents per<br />

section/chapter. The chapter labels shall identify the information included in that<br />

chapter as well as its file name, i.e.: RTU Panel Layout.<br />

f. Scanned images of written documents are not acceptable. Document must allow<br />

character selection. Text within a file shall be transferable to other documents.<br />

g. Submit a preliminary version of the electronic format of the manual for review.<br />

Upon approval of the preliminary submittal, the Contractor shall provide 3 copies of<br />

the electronic manual to the Owner.<br />

G. Factory Test Reports<br />

H. Equipment Installation Report<br />

Supervisory Control and Data Acquisition (SCADA) System 40 90 02-8<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS