Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

2.2 FORMWORK ACCESSORIES<br />

A. Form Ties: Removable or snap-off type of adjustable length; to leave no metal within<br />

1 inch of concrete surface and no holes larger than 1 inch in diameter in surface of<br />

concrete.<br />

B. Form Release Agent: Colorless material which will not stain concrete, absorb moisture,<br />

or impair bonding capability of finishes or coating on concrete.<br />

C. Dovetail Anchor Slots: Minimum 16 gage galvanized steel; longest possible length with<br />

alignment splines for joints; release tape sealed slots; securable to concrete formwork.<br />

D. Fillets for Chamfered Corners: Clear wood or rigid plastic, ¾ inch x ¾ inch; furnished in<br />

maximum possible lengths.<br />

PART 3 EXECUTION<br />

3.1 GENERAL REQUIREMENTS<br />

A. Formwork design and fabrication, as well as its construction, are the responsibility of the<br />

Contractor.<br />

B. Formwork shall be used to confine the concrete and to shape it to the required shapes,<br />

lines, and dimensions.<br />

C. Formwork shall have sufficient strength to resist the loads that result from the placing and<br />

vibration of concrete and shall have sufficient rigidity to maintain the dimensions of the<br />

concrete within the specified tolerances.<br />

D. Except at inside faces of turned-down slabs, earth cuts shall not be used as forms for<br />

vertical surfaces.<br />

3.2 FORM CONSTRUCTION AND INSTALLATION<br />

A. Forms shall be adequately braced and securely fastened before any concrete is placed.<br />

Arrange exposed joints symmetrically. Make joints tight to prevent mortar leakage.<br />

Design forms to be removed without damage to concrete in place. Used form material<br />

can be used subject to approval by the Engineer if clean and undamaged.<br />

B. Except as otherwise shown, specified, or permitted, forms may be constructed of wood or<br />

steel.<br />

C. Provide openings and recesses required for Work under this contract.<br />

D. Provide ¾-inch chamfer at exposed exterior corners and edges except as otherwise<br />

shown.<br />

May 18, 2012<br />

Concrete Formwork<br />

Revision 0 03 10 00 - 2