Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

reinforcement. Include special reinforcement required at openings through concrete<br />

structures.<br />

D. In accordance with Section 01 33 00: Submittal Procedures.<br />

PART 2 PRODUCTS<br />

2.1 MATERIAL STANDARDS<br />

A. Reinforcing Bars: ASTM A615, deformed, Grade 40 for beam stirrups and column ties;<br />

Grade 60 for other uses.<br />

B. Welded Wire Fabric: ASTM A185, furnished in flat sheets or standard rolls.<br />

PART 3 EXECUTION<br />

3.1 DETAILING<br />

A. Except as shown otherwise in the details on the Drawings or required by the applicable<br />

provisions of the current edition of ACI 318, reinforcement shall be detailed in<br />

accordance with ACI 315.<br />

3.2 FABRICATION<br />

A. Except as otherwise shown on the drawings or specified in this section or other sections<br />

of these specifications, fabrication of reinforcing steel shall be in accordance with the<br />

CRSI Manual of Standard Practice.<br />

B. All reinforcing steel shall be bent cold to the required configurations.<br />

C. Except as specifically shown otherwise on the Drawings, all reinforcing steel shall be<br />

shop fabricated.<br />

D. Do not weld reinforcing bars without specific prior approval of the Engineer.<br />

3.3 INSTALLATION<br />

A. General: Verify that field conditions are acceptable and are ready for the beginning of<br />

installation of reinforcement and other embedded items. Do not begin installation until<br />

all unsatisfactory conditions have been corrected.<br />

B. Except as otherwise shown on the Drawings or specified in this section or other sections<br />

of these Specifications, install reinforcing steel in accordance with CRSI 63.<br />

C. Prior to placing reinforcement, remove scale, loose or flaking rust, dirt, grease, and other<br />

coatings that may prevent or impair bond. Protect reinforcement from contaminants after<br />

placement.<br />

May 18, 2012<br />

Concrete Reinforcement<br />

Revision 0 03 20 00 - 2