SECTION 500 - METERING AND ASSOCIATED EQUIPMENT<br />

500.01 General<br />

Meter sockets shall be provided, installed and maintained by Customer. When the<br />

ratings of meter sockets are exceeded, transockets shall be used. Transockets,<br />

when required, shall be provided by Company and installed and maintained by<br />

Customer. See Figure 5-A, pages 44 & 45 for conductor, connector and<br />

connection details.<br />

500.02 Work on Meter Installations<br />

Electricians and electrical contractors, prior to removing self contained<br />

meters (excluding 480 V self contained meters) and disconnecting power<br />

must contact the Company’s electrician voice mailbox at 1-800-518-2374 and<br />

provide requested information. The information required is provided on<br />

page 70.<br />

500.03 Sequence of Connecting Facilities<br />

The standard sequence for connecting equipment to Company’s existing delivery<br />

system facilities is as follows:<br />

COMPANY’S ELECTRICAL DELIVERY SYSTEM<br />

│<br />

POINT OF DELIVERY<br />

│<br />

METERING EQUIPMENT<br />

│<br />

CUSTOMER’S SERVICE EQUIPMENT<br />

│<br />

CUSTOMER’S ELECTRICAL LOAD<br />

A sequence of facilities other than illustrated here should be done only with prior<br />

approval of the Company.<br />

500.04 Location of Meter<br />

Consistent with good utility practice, a meter and its associated equipment shall be<br />

installed in a location that facilitates the provision of safe and reliable delivery<br />

service and accurate measurement and that provides clear working space on all<br />

sides. The center of the socket opening shall be not less than four feet and<br />

not more than six feet above the finished grade. All meter locations should be<br />

as near as possible to the point of delivery. The Company shall have direct,<br />

unobstructed access to all meter locations. Meter locations likely to become<br />

obstructed in the future shall be avoided.<br />

The Company’s electrical delivery system and the metering equipment shall be<br />

located outside the building. If the Customer requires a location other than outside<br />

the building or if service conductor and conduit must pass under permanent<br />

structures, foundations or structure slabs, the Customer shall install and own the<br />

Copyright 2010 Oncor Electric Delivery Company. All rights reserved<br />