25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

E. Comply with NECA 1.<br />

3.3 IDENTIFICATION<br />

A. Identify enclosed controllers, components, and control wiring in accordance with Section<br />

26 05 53, “Identification for Electrical Systems”.<br />

1. Identify field-installed conductors, interconnecting wiring, and components;<br />

provide warning signs.<br />

2. Label each enclosure with engraved nameplate.<br />

3. Externally visible, permanent nameplates shall be provided to identify each<br />

switch, indicating light, etc. Equipment and terminal blocks shall be suitably<br />

identified. This shall include items on the back side of doors and panel mounted<br />

items. Nameplates shall be black with white lettering and attached with stainless<br />

steel screws.<br />

3.4 CONTROL WIRING INSTALLATION<br />

A. Install wiring between enclosed controllers and remote devices.<br />

B. Bundle, train, and support wiring in enclosures.<br />

C. Connect selector switches and other automatic-control selection devices where<br />

applicable.<br />

1. Connect selector switches to bypass only those manual- and automatic-control<br />

devices that have no safety functions when switch is in manual-control position.<br />

2. Connect selector switches with enclosed-controller circuit in both manual and<br />

automatic positions for safety-type control devices such as low- and highpressure<br />

cutouts, high-temperature cutouts, and motor overload protectors.<br />

3.5 FIELD QUALITY CONTROL<br />

A. Upon completion of the installation, perform continuity tests and functional checkout to<br />

assure the proper operation of all equipment.<br />

B. Acceptance Testing Preparation:<br />

1. Test insulation resistance for each enclosed controller, component, connecting<br />

supply, feeder, and control circuit.<br />

2. Test continuity of each circuit.<br />

C. Tests and Inspections:<br />

1. Inspect controllers, wiring, components, connections, and equipment installation.<br />

Test and adjust controllers, components, and equipment.<br />

2. Test insulation resistance for each enclosed-controller element, component,<br />

connecting motor supply, feeder, and control circuits.<br />

3. Test continuity of each circuit.<br />

4. Verify that voltages at controller locations are within plus or minus 10 percent of<br />

motor nameplate rated voltages. If outside this range for any motor, notify<br />

Contractor/Owner before starting the motor(s).<br />

5. Test each motor for proper phase rotation.<br />

May 18, 2012<br />

Enclosed Controllers<br />

Revision 0 26 29 13 - 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!