1.03 QUALITY ASSURANCE<br />

A. Suppliers Qualifications: The complete system shall be configured, programmed, and<br />

installed by one qualified system supplier who is regularly engaged and qualified in<br />

designing and building instrument control systems. The system suppliers shall assume<br />

complete systems responsibility, including coordination and interfacing with all subsystems<br />

and equipment suppliers and manufacturers. The installation supervisor shall have had<br />

experience in overseeing installation and start-up of at least three similar installations. The<br />

bidder shall submit, upon ENGINEER's request, complete company history, resumes of full<br />

time project manager for this project, other key full-time system analysts, programmers,<br />

technicians, and submit project list with costs, OWNER, contact person, phone number, etc.<br />

B. Tests: The complete system shall be assembled and tested at the job site. The OWNER'S<br />

representative and the ENGINEER'S presence will be required at the time of final testing at<br />

the system supplier's facilities.<br />

C. Standards: All applicable NEC, ISA, IEEE, NEMA, UL, ANSI, IEC, FCC, FM standards shall<br />

apply. All equipment shall be new and UL listed and labeled.<br />

D. Assembly, Storage, & Handling: Once assembled and tested, the system shall be stored in<br />

air-conditioned and heated rooms. Ship the unit to job site only after the control room has<br />

been built and its HVAC system is in operation.<br />

1. The Owner may approve partial payment for SCADA equipment ready to be onsite but<br />

is stored off site. Partial payment may be disallowed by the Owner.<br />

a. For partial payment, the Owner shall receive as a minimum a sales receipt, lien<br />

release, proof of insurance and the Owner’s name shall be stenciled on the<br />

equipment being paid for.<br />

E. Acceptable PLC Manufacturers:<br />

1. Modicon<br />

2. No Approved Equal<br />

F. Acceptable SCADA Installers:<br />

1. Prime Controls (972)221-4849<br />

2. Richardson Logic (972)542-7375<br />

3. UMC Automation (432)524-2456<br />

4. No Approved Equal.<br />

1.04 SYSTEM DESCRIPTION<br />

A. Furnish and install a programmable controller-based supervisory control and data<br />

acquisition system configured as a distributed processing network as defined by the<br />

Contract Documents. Control functions shall include digital logic control, PID control, and<br />

setpoint control.<br />

Supervisory Control and Data Acquisition (SCADA) System 40 90 02-9<br />