E. Coordinate with architectural reflected ceiling plans the exact location and dimensioning of<br />

items which occur within hung ceilings. Request clarification from the Engineer prior to<br />

proceeding with fabrication or installation if a conflict exists.<br />

F. Schedule construction activities in sequence required to obtain best results where<br />

installation of one part of the Work is dependent on installation of other components, either<br />

before or after its own installation.<br />

G. Make adequate provisions to accommodate items scheduled for later installation, including:<br />

1. Accepted alternates,<br />

2. Installation of products purchased with allowances,<br />

3. Work by others,<br />

4. Owner-supplied, BIDDER-installed items.<br />

H. Sequence, coordinate, and integrate the various elements of mechanical, electrical, and<br />

other systems, materials, and equipment if applicable. Comply with the following<br />

requirements:<br />

1. Coordinate mechanical and electrical systems, equipment, and materials installation<br />

with other building components.<br />

2. Verify all dimensions by field measurements.<br />

3. Arrange for chases, slots, and openings in other building components during progress of<br />

construction.<br />

4. Coordinate the installation of required supporting devices and sleeves to be set in castin-place<br />

concrete and other structural components, as they are constructed.<br />

5. Install systems, materials, and equipment as permitted by codes to provide the<br />

maximum headroom possible where mounting heights are not detailed or dimensioned.<br />

6. Coordinate the connection of systems with exterior underground and overhead utilities<br />

and services. Comply with the requirements of governing regulations, franchised<br />

service companies, and controlling agencies. Provide required connection for each<br />

service.<br />

7. Install systems, materials, and equipment to conform with approved submittal data,<br />

including coordination drawings, to the greatest extent possible. Conform to<br />

arrangements indicated by the Contract Documents, recognizing that portions of the<br />

Work are shown only in diagrammatic form. Adjust routing of piping, ductwork, utilities,<br />

and location of equipment as needed to resolve spatial conflicts between the various<br />

trades. Document changes in the indicated routings on the Record Drawings.<br />

8. Install systems, materials, and equipment level and plumb, parallel and perpendicular to<br />

other building systems and components.<br />

9. Install systems, materials, and equipment to facilitate servicing, maintenance, and repair<br />

or replacement of components. As much as practical, connect for ease of disconnecting,<br />

with minimum of interference with other installations. Extend grease fittings to<br />

accessible locations.<br />

10. Install access panel or doors where units are concealed behind finished surfaces.<br />

11. Install systems, materials, and equipment giving right-of-way priority to systems<br />

required to be installed at a specified slope.<br />

1.<strong>08</strong> BIDDER'S USE OF SITE<br />

A. Limit the use of Site for Work and storage to those areas designated on the Drawings or<br />

approved by the Engineer. Coordinate the use of the premises with the CMAR/Engineer.<br />

Project Management and Coordination – <strong>Bid</strong> <strong>Package</strong> #8 01 31 00-3<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!