a. Preliminary construction schedule per Section 01 32 16 <strong>Construction</strong> Progress<br />

Schedule (if applicable).<br />

b. Preliminary submittal schedule per Section 01 33 00, Submittal Procedures.<br />

c. Schedule of values and anticipated schedule of payments per Section 01 29 00,<br />

Payment Procedures.<br />

d. List of Subcontractors and Suppliers.<br />

e. <strong>Bid</strong>der's organizational chart as it relates to this project.<br />

f. Letter indicating the agents of authority for the <strong>Bid</strong>der’s and the limit of that<br />

authority with respect to the execution of legal documents, contract modifications<br />

and payment requests.<br />

B. Progress Meetings<br />

1. Attend meetings with the CMAR, Engineer and Owner as required.<br />

a. Meet on a monthly basis or as requested by the CMAR to discuss the project.<br />

b. Meet at the project site or other location as designated by the CMAR.<br />

c. <strong>Bid</strong>der's superintendent and other key personnel are to attend the meeting. Other<br />

individuals may be requested to attend to discuss specific matters.<br />

d. Notify the CMAR of any specific items to be discussed a minimum of one week prior<br />

to the meeting.<br />

2. Provide information as requested by the CMAR, Engineer or Owner concerning this<br />

project. Prepare to discuss:<br />

a. Status of overall project schedule.<br />

b. CMAR's detailed schedule for the next month.<br />

c. Anticipated delivery dates for equipment.<br />

d. Coordination with the Owner/Engineer/CMAR.<br />

e. Status of submittals.<br />

f. Information or clarification of the Contract Documents.<br />

g. Claims and proposed modifications to the contract.<br />

h. <strong>Field</strong> observations, problems, or conflicts.<br />

i. Maintenance of quality standards.<br />

3. Engineer/CMAR will prepare minutes of meetings. Review the minutes of the meeting<br />

and notify the Engineer/CMAR of any discrepancies within ten days of the date of the<br />

meeting memorandum. The minutes will not be corrected after the ten days have<br />

expired. Corrections will be reflected in the minutes of the following meeting or as an<br />

attachment to the minutes.<br />

C. Pre-submittal and Pre-installation Meetings<br />

1. Conduct pre-submittal and pre-installation meetings as required in the individual<br />

technical Specifications or as determined necessary by the CMAR/Engineer (for<br />

example, instrumentation, roofing, concrete mix design, etc.).<br />

2. Attend the meeting and require the participation of appropriate Subcontractors and<br />

Suppliers in the meeting.<br />

3. CMAR will prepare minutes of the meeting for review. <strong>Bid</strong>der will review the minutes of<br />

the meeting and notify the CMAR of any discrepancies within ten days of the date of the<br />

meeting memorandum. The minutes will not be corrected after the ten days have<br />

expired. Corrections will be reflected in a revised set of meeting minutes.<br />

1.05 REQUESTS FOR INFORMATION<br />

Project Coordination – <strong>Bid</strong> <strong>Package</strong> #8 01 31 13-2<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />