3. Shall not undertake any of the responsibilities of CMAR, Subcontractor, Suppliers,<br />

or CMAR's superintendent.<br />

4. Shall not advise on, issue directions relative to or assume control over any aspect<br />

of the means, methods, techniques, sequences or procedures of construction<br />

unless such advice or directions are specifically required by the Contract<br />

Documents.<br />

5. Shall not advise on, issue directions regarding or assume control over safety<br />

precautions and programs in connection with the Work or any activities or<br />

operations of Owner or CMAR.<br />

6. Shall not accept shop drawing or sample submittals from anyone other than the<br />

CMAR.<br />

7. Shall not participate in specialized field or laboratory tests or inspections<br />

conducted by others, except as specifically authorized by Engineer. “<br />

SC‐9.05 Make the following modifications to 9.05 Authorized Variations in Work<br />

A. Amend paragraph 9.05 by inserting the following sentence prior to the last sentence of<br />

the paragraph:<br />

“The <strong>Bid</strong>der shall notify the CMAR/Engineer in writing prior to beginning any Work<br />

addressed in a <strong>Field</strong> Order if the <strong>Bid</strong>der does not agree that the Work involved represents<br />

no additional cost and/or time change in the Contract Documents. “<br />

SC‐10.05<br />

Make the following modifications to 10.05 Claims and Disputes<br />

A. Amend paragraph 10.05 as follows:<br />

“Change the reference in the first sentence from “30 days” to “7 days.”<br />

SC‐11.01<br />

Make the following modifications to 11.01 Cost of the Work<br />

A. Amend paragraph 11.01 A. of the General Conditions by striking out the following words<br />

in the third sentence: "those prevailing in the locality of the Project, shall include only the<br />

following items, and shall not include any of the costs itemized in paragraph 11.01 B." and<br />

adding the following:<br />

"those paid for the Work included in the Contract Price, shall include only the following<br />

items, and shall not include any of the costs itemized in paragraph 11.01 B. <strong>Bid</strong>der shall<br />

provide certified payroll records listing personnel classifications and salaries for all<br />

Supplementary Conditions (Revised per <strong>Garney</strong>)<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project - Pump Stations 00 73 00 - 22<br />

12/28/2011