Colorado River Municipal Water District<br />

Vertical Turbine Submersible Pumping Units<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

1.5 Product Data<br />

A. Mark each copy to identify applicable products, models, options, and other data.<br />

Supplement manufacturers' standard data to provide information unique to this Project.<br />

B. Include recommendations for application and use, and reference to compliance with<br />

specified standards of trade associations and testing agencies.<br />

C. Include notation of special coordination requirements for interfacing with adjacent work<br />

and building utilities where applicable.<br />

1.6 Design Data<br />

A. Submit for Engineer's knowledge as contract administrator or for Owner.<br />

B. Submit for information for limited purpose of assessing conformance with information<br />

given and design concept expressed in Contract Documents.<br />

1.7 Certificates<br />

A. When specified in individual specification sections, submit certification by manufacturer,<br />

installation/application subcontractor, or Seller to Engineer.<br />

B. Indicate material or product conforms to or exceeds specified requirements. Submit<br />

supporting reference data, affidavits, and certifications as appropriate.<br />

C. Certificates may be recent or previous test results on material or product, but must be<br />

acceptable to Engineer.<br />

1.8 Manufacturer Instructions<br />

A. When specified in individual specification sections, submit manufacturers' printed<br />

instructions for delivery, storage, assembly, installation, startup, adjusting, and finishing.<br />

B. Identify conflicts between manufacturers' instructions and Contract Documents.<br />

C. Indicate special procedures, conditions requiring special attention and special<br />

environmental criteria required for application or installation.<br />

1.9 Manufacturer <strong>Field</strong> Reports<br />

A. Submit reports for Engineer’s benefit as contract administrator or for Owner.<br />

B. Submit report within 30 days of observation to Engineer for information.<br />

C. Submit for information for limited purpose of assessing conformance with information<br />

given and design concept expressed in Contract Documents.<br />

January 2012<br />

Submittal Procedures<br />

Revision 0 01300 - 3