for the Goods. Seller shall also require the carrier to give Buyer at least 24 hours notice by<br />

telephone prior to the anticipated time of delivery.<br />

C. Buyer will be responsible and bear all costs for unloading the Goods from carrier.<br />

D. Buyer will assure that adequate facilities are available to receive delivery of the Goods during<br />

the Contract Times for delivery set forth in the Agreement, or another date agreed by Buyer and<br />

Seller.<br />

E. No partial deliveries shall be allowed, unless permitted or required by the Contract Documents or<br />

agreed to in writing by Buyer.<br />

6.03 Risk of Loss<br />

A. Risk of loss and insurable interests transfer from Seller to Buyer upon Buyer’s receipt of the<br />

Goods.<br />

B. Notwithstanding the provisions of Paragraph 6.03.A, if Buyer rejects the Goods as nonconforming,<br />

the risk of loss on such Goods shall remain with Seller until Seller corrects the nonconformity<br />

or Buyer accepts the Goods. If rejected Goods remain at the Point of Destination<br />

pending modification and acceptance, then Seller shall be responsible for arranging adequate<br />

protection and maintenance of the Goods at Seller's expense.<br />

6.04 Progress Schedule<br />

A. Seller shall adhere to the progress schedule established in accordance with Paragraph 2.06 as it<br />

may be adjusted from time to time as provided below.<br />

1. Seller shall submit to Engineer for acceptance (to the exten t indicated in Paragraph 2.06)<br />

proposed adjustments in the pr ogress schedule that will not result in changing the<br />

Contract Times. Such adjustm ents will co mply with any provisions of the General<br />

Requirements applicable thereto.<br />

2. Proposed adjustments in the progress schedule that will change the Contract Times shall<br />

be submitted in accordance with the requirements of Article 7. Adjustments in Contract<br />

Times may only be made by a Change Order.<br />

ARTICLE 7 – CHANGES: SCHEDULE AND DELAY<br />

7.01 Changes in the Goods and Special Services<br />

A. Buyer may at any time, without notice to any surety, make an addition, deletion, or other revision<br />

to the Contract Documents with respect to the Goods and Services, within the general scope of<br />

the Contract, by a Change Order or Work Change Directive. Upon receipt of any such<br />

document, Seller shall promptly proceed with performance pursuant to the revised Contract<br />

Documents (except as otherwise specifically provided).<br />

B. If Seller concludes that a Work Change Directive issued by Buyer affects the Contract Price or<br />

Contract Times, then Seller shall notify Buyer within 15 days after Seller has received the Work<br />

EJCDC P-700, Standard General Conditions for Procurement Contracts.<br />

Copyright © 2010 National Society of Professional Engineers, American Council of Engineering Companies,<br />

American Society of Civil Engineers, and Associated General Contractors of America. All rights reserved.<br />

Page 00700-16