25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

D. All construction areas shall be finally graded as indicated on the contract documents or to<br />

the conditions of the site prior to construction. Grading shall bring the site back to the<br />

existing conditions as close as practical. Turfed areas shall be sodded, or hydro-mulched<br />

with matching turf. Landscaping shall be replaced with identical shrubbery, ground cover,<br />

or plants as existed. Contractor shall be responsible for maintaining water on new turf<br />

and landscaping until established. If new turf and landscaping is impractical due to<br />

weather conditions, contractor shall provide satisfactory arrangements to have turf and<br />

landscaping furnished and installed at the earliest opportunity thereafter. Provide a 90-day<br />

year warranty on new turn and landscaping.<br />

E. Determine if irrigation systems exist prior to trenching and excavation. Obtain record or<br />

as-built drawings and locate control wiring and pressure main branches and devices.<br />

Determine by actual operation that systems are functional and repair or replace damaged<br />

systems to their original condition prior to beginning construction.<br />

3.5 LOCKING OF ELECTRICAL FACILITIES<br />

A. Install locks immediately upon the installation of the electrical facility. Provide padlocks<br />

for exterior electrical facilities subject to unauthorized entry. Furnish the Owner with two<br />

(2) keys per lock up to a quantity of 10 keys. Key all locks alike. The Owner will provide<br />

permanent locks for the facility.<br />

3.6 ACCESS DOORS<br />

A. Wherever access is required in walls, ceilings, or soffits to concealed junction boxes, pull<br />

boxes or other electrical equipment, provide and install access doors. Install panels in<br />

locations approved by the Engineer. Paint as directed.<br />

3.7 CLEAN AND ADJUST<br />

A. Remove shipping labels, dirt, paint, grease, and stains from equipment. Remove debris as<br />

it accumulates. Upon completion of work, clean electrical equipment and the entire<br />

electrical installation.<br />

END OF SECTION<br />

May 18, 2012<br />

Common Work Results for Electrical<br />

Revision 0 26 05 00-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!