Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

3.2 GENERAL<br />

4. PVC COATED RIGID STEEL CONDUIT: All instrumentation cables – 4-<br />

20mA cables, or manufactured supplied cables – those that are associated with<br />

the level transmitters, flow meters, etc. shall be routed in rigid steel conduit in<br />

underground duct banks.<br />

5. RIGID ALUMINUM CONDUIT: May be used in all locations. PVC coated rigid<br />

aluminum conduit shall be used in corrosive environments or where in contact<br />

with concrete.<br />

6. RIGID NONMETALLIC CONDUIT: May be used in non-hazardous locations,<br />

installed single or grouped either underground or encased in concrete.<br />

7. LIQUID TIGHT FLEXIBLE METALLIC CONDUIT: Shall only be used to<br />

equipment in non-hazardous locations not subject to physical damage or<br />

excessive temperatures, requiring vibration isolation unless otherwise indicated,<br />

6’-0” maximum length. The bending radius shall be in accordance with Chapter<br />

9, Table 2 of the NEC and shall not deform or alter the flex jacket.<br />

A. Size conduits as required by the National Electrical Code for the number and sizes of<br />

wires to be drawn into the conduit. Above grade conduit less than ¾” shall not be used<br />

unless specified otherwise. Below Grade conduit shall not be less than 1”.<br />

B. Conduit stubbed up under free standing enclosures, such as motor control centers shall be<br />

PVC, stubbed up 1" above the finished floor level, and shall have a PVC bell terminator<br />

solvent welded onto each conduit end.<br />

C. Underground conduit from the service entrance disconnect switch to the equipment rack<br />

disconnect shall be concrete encased, all other underground conduit shall be concrete<br />

capped. Straight runs of conduit which is below the finished grade shall be rigid PVC.<br />

Unless otherwise indicated, all other conduit shall be rigid aluminum.<br />

D. At the transition from underground and or from concrete, protect PVC conduit from<br />

mechanical damage by extending PVC coated rigid aluminum conduit a maximum of<br />

12" and a minimum of 4" into the earth or concrete at the transition. For installations<br />

where the conduit does not penetrate concrete, provide a 12” wide housekeeping pad<br />

around conduit for transitions from underground to exposed conduit.<br />

E. Aluminum conduit, straps, and struts shall not be in direct contact with concrete or CMU<br />

walls, painted or not. Provide a rubber washer between the two materials.<br />

F. Aluminum conduit which penetrates into concrete shall be factory-coated with 0.20" of<br />

polyvinylchloride, per Spec. MIL-P-15147.<br />

G. Conduit extending into concrete shall not be closer than 3" from adjacent conduit and<br />

shall not be closer than 1" from any reinforcement bars.<br />

H. PVC conduit shall not be installed above grade level, above concrete slab level, or for<br />

any exposed installations unless specified. Conduit shall not be placed horizontally in a<br />

concrete floor slab or a beam without the Engineer's written approval.<br />

May 18, 2012<br />

Conduits<br />

Revision 0 26 05 33.01 - 4