Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

PART 2 PRODUCTS<br />

2.1 SUITABLE MATERIALS<br />

A. Suitable materials shall consist of materials obtained on- or off-site and approved by the<br />

Engineer for the purpose of subgrade preparation.<br />

B. Remove all grass and other vegetation prior to preparing to a depth of 6 inches prior to<br />

preparing subgrade.<br />

C. Any underlying soft or otherwise unsuitable material shall be removed and replaced with<br />

suitable material.<br />

2.2 WASTE<br />

A. Disposal of excavated materials shall be the responsibility of the Contractor.<br />

PART 3 EXECUTION<br />

3.1 PREPARATION<br />

A. Excavations and embankments for site grading shall be finished to the shapes,<br />

dimensions, and elevations shown on the Drawings.<br />

B. Perform clearing operations prior to beginning excavation, grading, and embankment<br />

operations.<br />

C. Scarify, water, and compact subgrade to not less than 95% of standard Proctor density<br />

(ASTM D-698) at optimum moisture content ±3%, to a depth of 6 inches minimum.<br />

D. If construction occurs over an existing drilling mud pit, over-excavate one foot below<br />

bottom of pit. Replace and compact using suitable native backfill materials (not drilling<br />

mud).<br />

3.2 GRADING<br />

A. Provide uniform slopes and rounded changes in slope, free of low spots.<br />

B. Drainage:<br />

1. Provide and maintain positive surface water drainage around and away from<br />

open excavations.<br />

2. Keep opened excavations dry.<br />

3. Remove free water in excavation promptly.<br />

END OF SECTION<br />

May 18, 2012<br />

Subgrade Preparation<br />

Revision 0 31 23 13 - 2