Colorado River Municipal Water District<br />

Vertical Turbine Submersible Pumping Units<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 01025<br />

MEASUREMENT AND PAYMENT<br />

PART 1 GENERAL<br />

1.1 Summary<br />

A. The unit price or lump sum price on each item, as stated in the Contract Documents, shall<br />

include furnishing all labor, superintendence, machinery, equipment, and materials<br />

necessary or incidental to complete the various items of work in accordance with the<br />

drawings and specifications. The quantities listed in the Contract Documents are<br />

estimated and not guaranteed. Payment for each item will be made for actual field<br />

measured quantities. Cost of work or materials shown on the drawings or called for in the<br />

specifications and for which no separate payment is made shall be included with the most<br />

applicable item(s).<br />

1.2 Unit Cost Items<br />

A. Unit cost items to be paid for at a unit cost per unit shall include all work and materials<br />

involved in the manufacturing, delivery and installation within the limits designated on<br />

the drawings. Measurement shall be made in units shown on the <strong>Bid</strong> Form. All work so<br />

included shall be installed, constructed or performed as shown on the drawings and/or<br />

specified herein.<br />

1.3 Lump Sum Items<br />

A. Lump sum items to be paid for at a lump sum price per job shall include all work and<br />

materials involved in the installation within the limits designated on the drawings. No<br />

measurement of the work or material included in such items will be made. All work so<br />

included shall be installed, constructed, or performed as shown on the drawings and/or<br />

specified herein.<br />

1.4 Submersible Pumping Unit, Complete<br />

A. No measurement will be made for furnishing a complete submersible pumping unit,<br />

including motor, pump, power cable, termination at motor, splices, and all incidental<br />

items to the end that a complete operating submersible pumping unit is provided as<br />

intended.<br />

B. Payment for furnishing the submersible pumping unit, including motor, pump, power<br />

cable, motor lead, termination at motor, splice (at motor lead and power cable),<br />

performance tests, and appurtenances, complete on site (FOB project site) as specified,<br />

shall be on a unit price basis as specified in the Contract Documents.<br />

PART 2 PRODUCTS<br />

Not Used<br />

January 2012<br />

Measurement and Payment<br />

Revision 0 01025 - 1