25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Vertical Turbine Submersible Pumping Units<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

1.10 Operation and Maintenance Data<br />

A. Submit data bound in 8½ x 11 inch (A4) text pages, three D-side ring binders with<br />

durable plastic covers. Submit a compatible digital copy of the entire operation and<br />

maintenance manual.<br />

B. Prepare binder cover with printed title "OPERATION AND MAINTENANCE<br />

INSTRUCTIONS", title of project.<br />

C. Internally subdivide binder contents with permanent page dividers, logically organized as<br />

described below, with tab titling clearly printed under reinforced laminated plastic tabs.<br />

D. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger<br />

drawings to size of text pages.<br />

E. Contents: Prepare Table of Contents for each volume, with each product or system<br />

description identified, typed on white paper, in three parts as follows:<br />

1. Part 1: Directory, listing names, addresses, and telephone numbers of Engineer,<br />

Seller, Subcontractors, and major equipment suppliers.<br />

2. Part 2: Operation and maintenance instructions, arranged by system and<br />

subdivided by specification section. For each category, identify names,<br />

addresses, and telephone numbers of Subcontractors, suppliers, and nearest<br />

competent service representative. Identify the following:<br />

a. Significant design criteria.<br />

b. List of equipment.<br />

c. Part list for each component.<br />

d. Operating instructions for startup, routine and normal operations,<br />

regulation and control, shutdown, and emergency conditions.<br />

e. Lubrication and maintenance instructions for equipment and systems.<br />

f. Maintenance instructions for finishes, including recommended cleaning<br />

methods and materials, and special precautions identifying detrimental<br />

agents.<br />

g. Guide to trouble shooting.<br />

h. Outline, cross section, and assembly drawings; engineering data; control<br />

schematics and point-to-point wiring diagrams, and reproductions of all<br />

equipment nameplates.<br />

i. Test data and performance curves, certified pump curves, etc., where<br />

applicable.<br />

j. All information supplied shall be specific to that equipment supplied for<br />

this product.<br />

3. Part 3: Project documents and certificates, including the following:<br />

a. Shop drawings and product data.<br />

b. Air and water balance reports.<br />

c. Certificates.<br />

d. Equipment Installation Report (EIR).<br />

e. Photocopies of warranties and bonds.<br />

F. The above information, as applicable, shall be provided for the equipment as indicated in<br />

individual specification sections.<br />

January 2012<br />

Submittal Procedures<br />

Revision 0 01300 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!