Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

C. Heat trace shall be labeled in order to identify and warn of heat trace location.<br />

D. Gland entry kit shall be used to transition heat trace into a junction box when making<br />

connections of a pipe or tank. It may be used for power splice or tee connections.<br />

3.3 INSTALLATION - PIPING SYSTEMS<br />

A. Exterior Piping: Insulate fittings, joints, and valves with insulation of like material and<br />

thickness as adjoining pipe, and finish with glass mesh reinforced vapor retarder cement.<br />

Cover with jacket with seams located at 3 or 9 o’clock position on side of horizontal<br />

piping with overlap facing down to shed water or on bottom side of horizontal piping.<br />

END OF SECTION<br />

May 18, 2012<br />

Plumbing Insulation<br />

Revision 0 22 07 00 - 5