Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

SECTION 40 90 01.01<br />

INSTRUMENTATION - FLOW METERS<br />

PART 1 GENERAL<br />

1.1 WORK INCLUDED<br />

A. Furnish labor, materials, equipment and incidentals necessary to install all flow meter<br />

instrumentation equipment as shown in the specifications and on the drawings.<br />

Contractor's work shall include but not be limited to the installation of equipment<br />

furnished under this contract.<br />

B. The Contractor's attention is directed to the fact that flow meter instrumentation is an<br />

integrated system and as such shall be furnished by one vendor or system integrator who<br />

shall provide all the equipment and appurtenances, regardless of manufacture, and be<br />

responsible to the Contractor for satisfactory operation of the entire system.<br />

C. Supervision, labor, tools, and materials necessary for installation of the flow meter<br />

instrumentation equipment and material furnished herein and their interconnection shall<br />

be provided by the Contractor. Installation work shall conform to applicable city, state,<br />

and national building and electrical codes.<br />

D. Coordinate the work of the system manufacturer's service personnel during construction,<br />

testing, calibration and acceptance of the instruments.<br />

E. Provide equipment as shown in the specifications and on the drawings.<br />

1.2 QUALITY ASSURANCE<br />

A. GENERAL: Equipment shall be the Manufacturer's latest and proven design.<br />

Specifications and drawings call attention to certain features, but do not purport to cover<br />

all details entering into the design of the instrumentation system. The completed system<br />

shall be compatible with the functions required and the equipment furnished by the<br />

Contractor.<br />

B. OPERATING VOLTAGE: Electrical components of the system shall operate on 120<br />

volt, single-phase, 60 Hertz, except as otherwise noted in the specifications.<br />

C. POWER SUPPLIES: The drawings and specifications indicate the energy sources that<br />

will be provided. Any other devices or power supplies necessary to obtain proper<br />

operation of the instrument system from these energy sources shall be furnished with the<br />

instrumentation.<br />

May 18, 2012<br />

Instrumentation Flow Meters<br />

Revision 0 40 90 01.01-1