Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

<br />

<br />

<br />

<br />

<br />

All equipment shall be shipped by the Vendor and delivered to the Owner at the job site in sound<br />

condition, free from any damage. Equipment, which has been damaged, may be rejected.<br />

Within fifteen (10) days after receipt of Purchase Order, the undersigned will execute the Purchase Order<br />

Agreement.<br />

The undersigned agrees to substantially complete all work covered by these Contract Documents within<br />

the time set forth in the Delivery Schedule above.<br />

Receiving, unloading and installation of the following pre-purchased submersible pumps as follows:<br />

o Section 11 97 00 – Submersible Pumps<br />

• Equipment Designation: D4, 9, 10-15, 17-19 and 22-24<br />

• Expected Delivery on or about 07/31/12 (if pumps are delivered later than this date<br />

the contract dates will be extended one calendar day for each calendar day delay,<br />

but no additional funds will be awarded, only days).<br />

o Section 11 07 00 – Submersible Pumps<br />

• Equipment Designation: D1-3 and 5-8<br />

• Expected Delivery on or about 09/28/12 (if pumps are delivered later than this date<br />

the contract dates will be extended one calendar day for each calendar day delay,<br />

but no additional funds will be awarded, only days).<br />

Receiving, unloading and installation of pre-purchased SCADA Equipment:<br />

o Section 40 90 02.01 – Installation of Pre-Purchased SCADA Equipment<br />

• Equipment Designation: RTUs, Antenna Towers and Radio Antennas for each of the 21<br />

well sites.<br />

• Expected Delivery to be determined.<br />

The undersigned agrees to substantially complete all work covered by these Contract Documents within the time<br />

set forth in the Delivery Schedule above.<br />

The undersigned certifies that he has carefully examined these specifications and:<br />

Signature of <strong>Bid</strong>der’s Agent<br />

Requests exceptions to the Specifications.<br />

Signature of <strong>Bid</strong>der’s Agent<br />

Does Not request exceptions to the Specifications.<br />

Statement of Exceptions to Specifications. (What do you take exception to and why?)<br />

__________________________________<br />

_____________________________________<br />

________________________________________________________________________________________<br />

________________________________________________________________________________________<br />

<strong>Bid</strong> Proposal Form – <strong>Bid</strong> <strong>Package</strong> #8<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong> BP - 6<br />