3. Safety Function Wiring:<br />

a. Emergency shutdown switches shall not be wired into the controller.<br />

4. An emergency power disconnect shall be placed in the power circuit feeding the power<br />

supply as a means of removing power from the entire PLC system.<br />

a. Capacitor shall be placed across the disconnect to protect against current outrush<br />

through trails.<br />

5. Safe Wiring:<br />

a. Equipment failure mode shall be selected so that the loss of power or control signal<br />

to the equipment will result in the equipment either shutting down or operating<br />

safely.<br />

b. Activation of alarms and stopping of equipment shall result from the deenergization<br />

of control circuits, rather than the energization of control circuits.<br />

c. Low voltage control signal wires:<br />

1) Place in conduit segregated for that purpose only<br />

2) Twisted shielded wire pair<br />

Not located in the same conduit or bundle with power wiring<br />

6. Initial Safety Conditions:<br />

a. Utilize program module to dictate output states in a known and safe manner prior<br />

to running of control program.<br />

b. Utilize program each time PLC is re-initiated and the control program activated.<br />

7. PLC Fault Relay:<br />

a. Placed in series with any other emergency stop conditions<br />

b. Opening of PLC Fault Contact:<br />

1) Upon unsafe or undesirable system operation, including:<br />

c. Loss of memory<br />

d. Processor fault<br />

e. Power supply fault<br />

f. Isolation failure<br />

g. Communications failure<br />

h. Isolation failure<br />

i. Communications failure<br />

j. Scan time overrun<br />

k. Module failure<br />

l. Scan time overrun<br />

m. Module failure<br />

8. Monitoring of Internal Faults and Display:<br />

a. Internal PLC system status and faults shall be monitored and displayed. Monitored<br />

items shall include:<br />

1) Memory ok/loss of memory<br />

2) Processor ok/processor fault<br />

3) Battery ok/battery low<br />

4) Power supply ok/power supply fault<br />

5) Isolation failure<br />

Supervisory Control and Data Acquisition (SCADA) System 40 90 02-14<br />

CMD11269 – Ward County Transmission System Expansion – Contract C – Above Slab TPS, OPS, and WPS