SC‐6.18<br />

G. In the event that <strong>Bid</strong>der requests a change of a previously approved item, <strong>Bid</strong>der shall<br />

reimburse CMAR forCMAR/ Engineer’s charges for its review time unless the need for<br />

such change is beyond the control of <strong>Bid</strong>der.”<br />

Make the following modifications to 6.18 Continuing the Work<br />

A. Delete the following from paragraph 6.18 – “or as Owner and CMAR may otherwise agree<br />

in writing.” Add the following language at the end of the second sentence of paragraph 6.18<br />

of the General Conditions:<br />

“<strong>Bid</strong>der assumes and bears responsibility for all costs and time delays associated with any<br />

variation from the requirements of the Contract Documents. “<br />

SC‐6.20<br />

Make the following modifications to 6.20 INDEMNIFICATION<br />

A. Add new paragraphs immediately after paragraph 6.20 A.2:<br />

“3. FROM ALL CLAIMS, DEMANDS, LIENS, OR SUITS ALLEGING NON‐PAYMENT BY CMAR<br />

BY ANY PERSON OR ENTITY WHO FURNISHED LABOR, MATERIALS, OR EQUIPMENT FOR<br />

USE IN THE PERFORMANCE OF THE CONTRACT, PROVIDED THERE IS NO Owner DEFAULT.”<br />

SC‐9.03<br />

Make the following modifications to 9.03 Project Representative<br />

A. Delete paragraph 9.03 in its entirety. Add the following:<br />

“9.03 Project Representative<br />

A. The Engineer will have a Resident Project Representative on the Site. The<br />

duties, responsibilities and the limitations of authority of the Resident Project<br />

Representative, and designated assistants, are as follows:<br />

1. Resident Project Representative is Engineer's agent at the site, will act as<br />

directed by and under the supervision of Engineer, and will confer with<br />

Engineer regarding Resident Project Representative's actions. Resident<br />

Project Representative's dealings in matters pertaining to the on‐site Work<br />

shall in general be with Engineer and CMAR, keeping Owner advised as<br />

necessary. Resident Project Representative's dealings with Subcontractors<br />

shall only be through or with full knowledge and approval of CMAR. Resident<br />

Project Representative shall generally communicate with Owner with the<br />

knowledge of and under the direction of Engineer.<br />

B. Duties and Responsibilities of Resident Project Representative:<br />

Supplementary Conditions (Revised per <strong>Garney</strong>)<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project - Pump Stations 00 73 00 - 18<br />