25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

3.8 TRENCH BACKFILL<br />

A. Material as defined by applicable reference for installation for type of pipe used.<br />

B. Traveled Areas:<br />

1. Compact to 90% ASTM D-698.<br />

2. Top 12 inches below finish grade, 95% ASTM D-698.<br />

C. Untraveled Areas:<br />

1. Compacted to at least undisturbed natural density.<br />

2. Not less than 90% ASTM D-698.<br />

D. Water-settled backfill; use only where permitted by Engineer.<br />

1. Where permitted, apply to obtain effective settlement with a minimum of water.<br />

2. Do not permit trench to overflow.<br />

3. Do not settle by water puddling until after trench has been backfilled to ground<br />

surface.<br />

4. Introduce water above the pipe embedment, through a long pipe nozzle, so<br />

disturbance of granular embedment or compacted material is held to an absolute<br />

minimum.<br />

5. Add backfill material to compensate for settlement below surface grade and<br />

settled during puddling operations.<br />

E. Upper 12 inches of trench shall contain no particles larger than 6 inches in any<br />

dimension.<br />

F. Surface Finish:<br />

1. For placement of paving or gravel surfacing, subgrade where applicable.<br />

2. Match existing and surrounding contours.<br />

3. Graded finished appearance.<br />

3.9 FIELD QUALITY CONTROL<br />

A. One proctor and gradation for each backfill material.<br />

B. One field density for each 500 linear feet of trench per lift.<br />

C. Maximum lift thickness: 12 inches compacted thickness.<br />

END OF SECTION<br />

May 18, 2012<br />

Trenching, Backfilling, and Compaction<br />

Revision 0 31 23 33 - 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!