OVERHEAD SERVICE TO<br />

TWO OR THREE METERS<br />

FIGURE 3-G<br />

NOTES:<br />

1. Meter sockets shall be provided, installed and maintained by the Customer. Transockets,<br />

when required, shall be provided by Company and installed and maintained by Customer.<br />

Sockets must be securely attached to wall. Customer installs service drop attachment of<br />

adequate strength for attachment of Company’s service drop conductors (see Figure 3-B,<br />

page 22). Service landing must provide service drop clearances required in Figure 2-A,<br />

page 14. For multifamily installations, see Figure 5-E, page 56.<br />

2. Service head, service raceway and service entrance conductors provided, installed and<br />

maintained by Customer.<br />

3. Two inch rigid steel conduit minimum for service mast supporting service drop. No<br />

coupling in the mast may be at or above the roof line. Service mast shall be of sufficient<br />

strength to support the service conductors.<br />

4. Service entrance conductors to extend from weatherhead to service landing, but in no<br />

case less than 36” minimum. Service head shall be located within 3’ of service landing<br />

attachment.<br />

5. It is Customer’s responsibility to meet requirements of all applicable codes and<br />

ordinances.<br />

6. For 240 volt four wire delta services, the “power leg” must be connected to the right hand<br />

terminals in meter sockets and be identified by orange insulation or painted orange at the<br />

weatherhead and in meter sockets.<br />

7. Service heads must be grouped for service drop.<br />

8. No more than three meter sockets (with a maximum of six service masts total) will be<br />

served in this manner. See Figure 3-H, page 28 for installations exceeding these<br />

requirements.<br />

9. Insulated conduit bushings are required for raceways terminating in the meter base.<br />

10. The use of flexible metallic conduit, liquid tight flexible metallic conduit, and liquid tight<br />

flexible non-metallic conduit for service entrance raceway is prohibited unless approved<br />

by the local inspecting authority.<br />

11. The use of Schedule 40 or 80 PVC for service mast not supporting service drop is<br />

allowed unless prohibited by the local inspecting authority.<br />

12. Each socket must be clearly and permanently marked as indicated in Section 500.11,<br />

page 43.<br />

13. Not for 3 wire delta services. See Figure 3-I, page 29.<br />

Copyright 2010 Oncor Electric Delivery Company. All rights reserved<br />