a. The maximum allowable deflection of pipe measured as the reduction in vertical<br />

inside diameter is 5.0 percent unless specified otherwise.<br />

b. Conduct test after the final backfill has been in place a minimum of 30 days.<br />

c. Thoroughly clear the lines before testing.<br />

2. Perform test by pulling a properly sized mandrel through the line. Measure deflection<br />

from the inside the pipe.<br />

3. Excavate and repair pipe with deflections in excess of the maximum allowable<br />

deflection.<br />

G. MANHOLE TESTING<br />

Test manholes for leakage separately and independently of the wastewater lines by<br />

hydrostatic exfiltration testing, vacuum testing or other approved methods acceptable to<br />

TCEQ. Test manholes after installation with all connections (existing and/or proposed) in<br />

place. Plug lift holes with an approved non‐shrink grout prior to testing. Install dropconnections<br />

and gas sealing connections prior to testing.<br />

1. Vacuum Test – Temporarily plug lines entering the manhole with the plugs braced to<br />

prevent them from being drawn into the manhole. Install plugs in the lines beyond<br />

drop‐connections, gas sealing connections, etc. Place the test head inside the frame at<br />

the top of the manhole and inflate in accordance with the manufacturer’s<br />

recommendations. Draw a vacuum of 10 inches of mercury, then turn off the vacuum<br />

pump. Read the level of vacuum after the required test time with the valve closed. The<br />

manhole will pass the test if the drop in the level is less than 1 inch of mercury (final<br />

vacuum greater than 9 inches of mercury). The required test time for 48 inch, 60 inch,<br />

and 72 inch manholes with depths up to 30 feet is two minutes. Test times for<br />

manholes of greater size and depths will be determined by the Engineer.<br />

2. Manhole Repairs – Manholes will be accepted in accordance with the criteria above.<br />

Repair any manhole which fails the initial test with non‐shrink grout or other suitable<br />

material as determine for the material from which the manhole is constructed. Retest<br />

the manhole as described above until a successful test is achieved. Remove all<br />

temporary plugs and grout after a successful test.<br />

H. TESTS FOR PLUMBING DRAINAGE AND VENT SYSTEMS<br />

1. Plug openings as necessary.<br />

2. Test drainage and venting systems by filling piping with water to the level of the highest<br />

vent stack for 30 minutes.<br />

3. Make the examination for leakage at joints and connections.<br />

4. Test fail if there is any drop in water level.<br />

3.06 ELECTRICAL TESTING<br />

A. Qualifications<br />

1. Perform testing using qualified personnel with a minimum of five years' experience<br />

installing and testing electrical equipment and machinery, unless otherwise specified.<br />

2. Use testing firms or individuals to perform tests that have not provided services or<br />

materials used on the Project or are otherwise related or affiliated with other CMARs or<br />

Suppliers for this project unless permitted by the CMAR/Owner.<br />

B. Report Forms<br />

Quality Requirements – <strong>Bid</strong> <strong>Package</strong> #8 01 40 00‐12<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/28/2012