Colorado River Municipal Water District<br />

Vertical Turbine Submersible Pumping Units<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

E. Submit the following Manufacturer’s Certificates in accordance with Section 01300,<br />

Submittals:<br />

1. Certificate of Compliance with qualification requirements as specified herein,<br />

including reference list<br />

2. Manufacturer’s certified factory test reports<br />

3. Manufacturer’s certified field test reports (to follow after field testing)<br />

4. Manufacturer’s Certificate of Compliance<br />

F. Submit Operation and Maintenance Manuals and Equipment Installation Report for<br />

pumping units.<br />

1.5 Quality Assurance<br />

A. Equipment manufacturer shall submit evidence of experience and qualifications equal to<br />

or greater than that required in “Instructions to <strong>Bid</strong>ders”. Inability to demonstrate<br />

experience and qualifications shall be grounds for rejection.<br />

B. Factory Testing: Certified factory tests of each pumping unit will be required. The factory<br />

test of the pumping unit shall produce at a minimum the following information:<br />

1. Head capacity curve: Take at least eight (8) points at 100% speed using job<br />

motor to Hydraulic Institute (HI) Standards, both rated head and rated capacities<br />

will be considered. The Owner reserves the right to witness testing.<br />

Manufacturer shall notify Engineer and Owner seven (7) days in advance of<br />

testing allowing time to make travel arrangements. Cost of travel if witnessing<br />

test(s) shall be borne by Engineer and Owner that is over and above the two (2)<br />

to be paid for by Contractor as identified in the <strong>Bid</strong> Form. Testing results that fall<br />

outside HI standards will be grounds for rejecting the equipment and the<br />

manufacturer correcting at his own expense, retesting at his own expense and<br />

reimbursing Owner/Engineer to witness the pump test a second time.<br />

2. Shaft brake horsepower curve.<br />

3. Wire to water efficiency (overall efficiency, including cable loss/column loss).<br />

4. Water to water efficiency (pump efficiency)<br />

5. Motor efficiencies. Dynamometer testing shall be performed on no less than five<br />

(5) motors that will be permanent part of the project.<br />

6. Test the stator insulation resistance with a megohmeter. The minimum acceptable<br />

insulation resistance level shall be 8,000 megohms (in a submerged condition).<br />

Megohm readings are expected to be at least one and two full orders of<br />

magnitude higher than the list minimum. Test phase to ground and phase to<br />

phase of all legs.<br />

7. Test motor winding resistance by using a Kelvin bridge.<br />

8. High potential test the motor insulation system at twice operating voltage plus<br />

1,000 V.<br />

9. Calculated running speed of motor during factory testing of the pumping unit to<br />

demonstrate compliance with capacity and head, based on dynamometer testing<br />

results.<br />

C. The factory test shall be conducted on the actual unit(s) to be installed in the field,<br />

including the pump and motor. A factor power cable having a premeasured loss may be<br />

used in lieu of the actual pump cable. The factory test shall be conducted after the<br />

January 2012<br />

Submersible Vertical Turbine Pumping Units<br />

Revision 0 11210 - 3