specified location) and to perform said Special Services fully, all in accordance with the<br />

Contract Documents.<br />

C. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known<br />

technical or construction industry or trade meaning are used in the Contract Documents in<br />

accordance with such recognized meaning.<br />

ARTICLE 2 – PRELIMINARY MATTERS<br />

2.01 Delivery of Bonds<br />

A. When Seller delivers the ex ecuted counterparts of the Agreement to Buyer, Selle r also shall<br />

deliver such bonds as Seller may be required to furnish.<br />

2.02 Evidence of Insurance<br />

A. When Seller delivers the executed counterparts of the Agreement to Buyer, Seller shall deliver to<br />

Buyer, with copies to each additional insured identified by name in the Supplementary<br />

Conditions, certificates of insurance (and other evidence of insurance which either of them or<br />

any additional insured may reasonably request) which Seller is required to purchase and maintain<br />

in accordance with Article 4.<br />

2.03 Copies of Documents<br />

A. Buyer shall furnish Seller up to five printed or hard copies of th e Contract Docum ents.<br />

Additional copies will be furnished upon request at the cost of reproduction.<br />

2.04 Commencement of Contract Times; Notice to Proceed<br />

A. The Contract Times will commence to run on th e thirtieth day after the Effective Date of the<br />

Agreement or, if a Notice to P roceed is given, on the day indicated in the Notice to Proceed. A<br />

Notice to P roceed may be given at any tim e within 30 d ays after th e Effective Date of the<br />

Agreement. In no event will the Contract Times commence to run later than the sixtieth day after<br />

the day of <strong>Bid</strong> opening or the thirtieth day after the Effective Date of the Agreem ent, whichever<br />

date is earlier.<br />

2.05 Designated Representatives<br />

A. Buyer and Seller shall each designate its representative at the time the Agreement is signed.<br />

Each representative shall have full authority to act on behalf of and make binding decisions in<br />

any matter arising out of or relating to the Contract.<br />

2.06 Progress Schedule<br />

A. Within 15 days after the Contract Times start to run, Seller shall submit to Buyer and Engineer<br />

an acceptable progress schedule of activities, including at a minimum, Shop Drawing and<br />

Sample submittals, tests, and deliveries as required by the Contract Documents. No progress<br />

payment will be made to Seller until an acceptable schedule is submitted to Buyer and Engineer.<br />

EJCDC P-700, Standard General Conditions for Procurement Contracts.<br />

Copyright © 2010 National Society of Professional Engineers, American Council of Engineering Companies,<br />

American Society of Civil Engineers, and Associated General Contractors of America. All rights reserved.<br />

Page 00700-5