25.10.2014 Views

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

Bid Package 08 North Well Field - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Colorado River Municipal Water District<br />

Raw Water Supply <strong>Well</strong> Sites<br />

Ward County <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

PART 3 EXECUTION<br />

3.1 INSTALLATION<br />

A. Install the panelboard in accordance with applicable codes at each location indicated on<br />

the plans. Provide filler plates for unused spaces in the panelboard. All labeling shall be<br />

in accordance to Section 26 05 00, “Common Work Results for Electrical”.<br />

END OF SECTION<br />

May 18, 2012<br />

Lighting and Branch Panelboards<br />

Revision 0 26 24 16.02 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!