01 50 00 TEMPORARY FACILITIES AND CONTROLS<br />

1.00 GENERAL<br />

1.01 WORK INCLUDED<br />

A. Furnish temporary facilities, storage sheds, and temporary utilities needed to complete the<br />

Work.<br />

B. Cost for Temporary Facilities and Controls as described in this section and provided by<br />

Suppliers and Subcontractors as described in this section are to be included in the BIDDER’s<br />

proposal. BIDDER efforts are included in the <strong>Bid</strong> <strong>Package</strong> #8 proposal.<br />

1.02 DELIVERY AND STORAGE<br />

A. Arrange transportation, loading, and handling of temporary buildings and sheds.<br />

1.03 JOB CONDITIONS<br />

A. Locate buildings and sheds at the job site as indicated or as approved by the Owner.<br />

B. Prepare the site by removing trees, brush, or debris and performing demolition or grubbing<br />

needed to clear a space adequate for the structures.<br />

C. Pay for the utilities used by temporary facilities during construction.<br />

D. Provide each temporary service and facility ready for use at each location when the service<br />

or facility is first needed to avoid delay in the performance of the work. Maintain, expand as<br />

required, and modify temporary services and facilities as needed throughout the progress of<br />

the work.<br />

E. Remove services and facilities when approved by the CMAR/Engineer.<br />

F. Operate temporary facilities in a safe and efficient manner.<br />

1.04 OPTIONS<br />

1. Restrict loads on temporary services or facilities to within their designed or designated<br />

capacities.<br />

2. Provide sanitary conditions. Prevent public nuisance, or hazardous conditions from<br />

developing or existing at the site.<br />

3. Prevent freezing of pipes, flooding, or the contamination of water.<br />

4. Maintain site security and protection of the facilities.<br />

A. <strong>Field</strong> offices may be prefabricated buildings on skids or mobile trailers.<br />

B. Storage sheds may be prefabricated buildings on skids or truck trailers.<br />

1.05 TEMPORARY OFFICE AND STORAGE BUILDINGS<br />

A. Furnish office and storage buildings of adequate size to store any materials or equipment<br />

delivered to the site that might be affected by weather.<br />

Temporary Facilities and Controls –<strong>Bid</strong> <strong>Package</strong> #8 01 50 00-1<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/24/2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!