1.03 SUBMITTALS<br />

<strong>Bid</strong>der assumes all costs necessary to incorporate the item and the CMAR/Engineer<br />

approves such revisions.<br />

3. Coordinate electrical requirements for the products to be installed in the project,<br />

including revisions in electrical equipment components wiring and other factors<br />

necessary to incorporate the component.<br />

A. Provide Submittals in accordance with Section 01 33 00, Submittal Procedures, and shall<br />

include:<br />

1.04 STANDARDS<br />

1. Certificates of Adequacy of Design, as described in Section 01 33 00, Submittal<br />

Procedures;<br />

2. Equipment Installation Reports per Section 01 75 00, Starting and Adjusting;<br />

3. Other documentation as required by detailed equipment specifications.<br />

A. The applicable industry standards referenced in Specifications shall apply as if written here<br />

in its entirety.<br />

B. Except where otherwise indicated, structural and miscellaneous fabricated steel used in<br />

items of equipment shall conform to the Standards of the American Institute of Steel<br />

<strong>Construction</strong>.<br />

1.05 GUARANTEES AND WARRANTIES<br />

A. Guarantee and or Warranty products furnished by the <strong>Bid</strong>der under this contract against:<br />

1. Faulty or inadequate design,<br />

2. Improper assembly or erection,<br />

3. Defective workmanship or materials,<br />

4. Leakage, breakage, or other failure.<br />

B. Guarantee and or Warranty the products installed under this contract, including products<br />

furnished by the Owner, against leakage, breakage, or other failure due to improper<br />

assembly or erection and against improper installation of the equipment. The guarantee<br />

and or warranty period shall be as defined in the General Conditions. Individual specification<br />

sections may have more stringent warranty requirements than stated in the General<br />

Conditions The most stringent warranty will be required in the event of any difference in the<br />

two aforementioned locations.<br />

2.00 PRODUCTS<br />

2.01 MATERIALS<br />

A. Design, fabricate, assemble, deliver and install according to normally accepted engineering<br />

and shop practices, except where a higher standard of quality is required by the Contract<br />

Documents.<br />

B. Manufacture like parts of duplicate units to standard sizes and gages. Like parts are to be<br />

interchangeable.<br />

Product Requirement – <strong>Bid</strong> <strong>Package</strong> #8 01 60 00-2<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />