Complete appropriate test report neatly and in ink for the items being tested. Note listed<br />

data that is not applicable or cannot be obtained as "N/A" or document with an explanation<br />

for the omission. Incomplete test forms will not be witnessed by the CMAR. Repeat tests<br />

not accepted. Substitute forms recording similar data and test equipment as that specified<br />

may be used if approved by the CMAR.<br />

C. Test Equipment<br />

1. Provide test equipment and materials necessary to perform the requested tests.<br />

2. Test equipment and apparatus shall be appropriate for the full range and duration of<br />

the test to be performed.<br />

3. Demonstrate that the test equipment is functioning properly, prior to the<br />

commencement of the test. Suspend the test and repair or replace the equipment if<br />

test equipment fails during any portion of a test. Repeat the test in its entirety or as<br />

otherwise required by the CMAR.<br />

4. Provide a copy of the test equipment calibration certificate to the CMAR prior to the<br />

commencement of the test. Provide test equipment that has been calibrated with six<br />

months of the date of the test using methods approved by the National Institute of<br />

Standards and Technology.<br />

D. Execution<br />

1. Make appropriate repairs or replacements if the circuit, equipment or machinery being<br />

tested does not pass. Repeat test as directed by the CMAR.<br />

2. The more rigid requirement prevail if test procedures or equipment conflicts occur<br />

between the various sections and/or Supplier’s recommendations.<br />

E. Electrical Cable<br />

1. Communication Cable And Conductors ‐ Submit test forms to the Owner's for approval<br />

prior to performing the following tests:<br />

a. Test shielded pair, telephone, paging, signaling and computer cables for continuity,<br />

short circuits and grounds with a low voltage source, not to exceed the insulation<br />

rating of the conductors or jacket.<br />

b. Test fiber‐optic cable between terminating ends for each circuit per the Supplier’s<br />

recommendation. Cables, splices (where permitted), and connectors shall be tested<br />

for continuity, band width (maximum), and attenuation losses.<br />

2. 600 Volt Cable And Conductors:<br />

a. Test power and control conductors rated at 600 volts with an insulation resistance<br />

tester at 1,000 volts, with respect to ground, and at 1,000 volts with respect to all<br />

other conductors in each circuit.<br />

b. Verify suitable ground connections are provided and maintained throughout the<br />

test.<br />

c. Perform tests and record results as required by the "600 Volt Cable Test Report" or<br />

form provided by the CMAR/Engineer.<br />

d. Test each circuit and record the results for continuity between terminating ends<br />

with a low voltage source.<br />

3. 5kv Cable And Conductors:<br />

Quality Requirements – <strong>Bid</strong> <strong>Package</strong> #8 01 40 00‐13<br />

Colorado River Municipal Water District<br />

Ward County Water Supply Expansion Project – <strong>North</strong> <strong>Well</strong> <strong>Field</strong><br />

5/28/2012