29.01.2013 Views

University of Vaasa - Vaasan yliopisto

University of Vaasa - Vaasan yliopisto

University of Vaasa - Vaasan yliopisto

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

54<br />

Boundary & interface between SMS and legal &<br />

regulatory compliance system<br />

Boundary & interface between SMS and risk management<br />

system<br />

4b6<br />

4b7<br />

4c Management <strong>of</strong> change<br />

Change process exists<br />

& is fully &<br />

effectively<br />

implemented<br />

Change process<br />

exists, but<br />

implementation is<br />

incomplete or<br />

ineffective<br />

Process to identify &<br />

assess requirements<br />

for, & to develop &<br />

implement changes<br />

to SMS scope or<br />

functionality is<br />

limited<br />

Process to identify & manage requirements for change in<br />

system scope<br />

4c1<br />

System Component #5 – Organizational Sustainability Management Standards (Maximum Score = 33)<br />

Maturity Level 3<br />

(Score 3)<br />

Maturity Level 2<br />

(Score 2)<br />

Maturity Level 1<br />

(Score 1)<br />

System Attribute Notes<br />

Identification <strong>of</strong> Requirements for Standards (Using<br />

input from Module 2)<br />

5a<br />

Process is a routine,<br />

integral part <strong>of</strong><br />

management process<br />

with well<br />

implemented actions<br />

Process exists but is<br />

not embedded in<br />

management process<br />

Process missing,<br />

informal, incomplete<br />

or otherwise<br />

inadequate<br />

Process to determine, from outputs <strong>of</strong> Section 2,<br />

requirements for organizational standards<br />

5a1<br />

Specific Minimum Requirements for Organizational<br />

Standards<br />

Process(es) to identify, assess, risk rank & mitigate all<br />

categories <strong>of</strong> sustainability impact<br />

5b<br />

Process, aspect or<br />

requirement is<br />

Process, aspect or<br />

requirements is<br />

Process, aspect or<br />

requirements is not<br />

5<br />

5b1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!