29.01.2013 Views

University of Vaasa - Vaasan yliopisto

University of Vaasa - Vaasan yliopisto

University of Vaasa - Vaasan yliopisto

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

57<br />

System Component #7 – Sustainability Management System Assurance, Performance Measurement & Continual Improvement<br />

Processes (Maximum Score = 33)<br />

Maturity Level 1 Maturity Level 2 Maturity Level 3<br />

System Attribute Notes<br />

(Score 1)<br />

(Score 2)<br />

(Score 3)<br />

7a Internal audit, assessment & assurance process<br />

Process exists & is<br />

fully & effectively<br />

implemented<br />

Process exists, but<br />

implementation is<br />

incomplete or<br />

ineffective<br />

Process is missing,<br />

informal, incomplete<br />

or otherwise<br />

inadequate<br />

7a1 Process for internal audit, assessment & assurance<br />

External (i.e. regulatory) audit, assessment &<br />

assurance process<br />

7b<br />

7b1 Process for external audit, assessment & assurance As Above As Above As Above<br />

Process to indentify, capture & implement lessons<br />

7c<br />

learned<br />

Process for identification & implementation <strong>of</strong> lessons<br />

7c1 As Above As Above As Above<br />

learned<br />

7d Performance Measurement<br />

7d1 Identification <strong>of</strong> sustainability performance indicators<br />

Use <strong>of</strong> indicators is a<br />

Use <strong>of</strong> indicators<br />

Implementation <strong>of</strong> performance measurement &<br />

Indicators are used routine, integral part<br />

7d2 missing, informal,<br />

management system<br />

but not embedded in <strong>of</strong> management<br />

incomplete or<br />

Systematic review <strong>of</strong> results versus performance<br />

management process process with well<br />

7d3 otherwise inadequate<br />

objectives<br />

implemented actions<br />

7e Management Review<br />

7e1 Management review <strong>of</strong> sustainability strategy Review missing,<br />

Review is a routine,<br />

Review performed<br />

Management review <strong>of</strong> sustainability aspects <strong>of</strong><br />

informal, incomplete<br />

integral part <strong>of</strong><br />

7e2 but not embedded in<br />

operational processes<br />

or otherwise<br />

management process<br />

management process<br />

7e3 Management review <strong>of</strong> stakeholder interests &<br />

inadequate<br />

with well

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!