29.12.2013 Views

comdtinst m16114.32c - U.S. Coast Guard

comdtinst m16114.32c - U.S. Coast Guard

comdtinst m16114.32c - U.S. Coast Guard

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix A – Unit and RFO Aids to Navigation Team Checklists<br />

Unit Name _______________________________________________________ Date ___________________<br />

Engineering Administration<br />

ITEM SAT UNSAT<br />

1. Are the following publications available and up-to-date? (Access by CD ROM or Web<br />

satisfactory)<br />

a. Naval Engineering Manual, COMDTINST M9000.6 (series)<br />

b. MLC SOP<br />

c. CG Naval Engineering Technical Publications<br />

d. Manufacturers Instruction Books and Service Manuals (as applicable to the<br />

individual unit)<br />

e. Allowance List<br />

f. PMS Technical Publications (AUX/MP/EM/DC)<br />

g. Drawings of boats and machinery (NETIMS acceptable)<br />

h. Are the boats’ blueprints indexed?<br />

i. Boat Management Manual, COMDTINST M16114.4 (series)<br />

2. Do the Engineering Standing Orders contain the following?<br />

a. Engineer duties in port and underway.<br />

b. When to call the EPO.<br />

c. Daily routine of Engineering Department in port.<br />

d. Instructions on the issue, use and replenishm<br />

ent of spare parts.<br />

3. Is/are the assigned boat(s) ad equate for the unit’s aid assignment list and specific area of<br />

operations?*<br />

NOTE<br />

*This is a subjective call by inspector and/or OIC. Provide specific amplifying<br />

information for an “UNSAT” entry.<br />

4. CSMP files. [Naval Engineering Manual, COMDTINST M9000.6 (series), Chapter<br />

090-4]<br />

a. Are CSMPs prepared for all major repair items to be corrected by the unit and any<br />

repairs beyond the unit’s capability?<br />

b. Are CSMPs filled out in accordance with detailed instructions contained in the<br />

reverse of CSMP card, FORM CG-2920?<br />

c. Does each card contain enough information to allow preparation of a specification?<br />

d. Are CSMPs submitted to MLC(v) for review and prioritization in accordance with<br />

MLC SOP?<br />

e. List CSMPs on file pending for over two years. (Full list required for General<br />

Information Checklist.)<br />

________________________________________________ ________________________________________________<br />

________________________________________________ ________________________________________________<br />

5. Engineering Change Requests (ECR, formerly BOATALT). (Full list of pending ECRs<br />

required for General Information Checklist.)<br />

a. Does the ECRs file show completed and pending items? [Naval Engineering<br />

Manual, COMDTINST M9000.6 (series), CH. 041-7]<br />

b. Are there incomplete Class “A” ECRs issued before the last routine availability?<br />

c. Are there incomplete Class “B” ECRs over three (3) years old?<br />

A-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!