higher heterotrophic fungi concentrations at the southern portion of the<br />

Project site. Furthermore the heavy metals and hydrocarbons were relatively<br />

low; however at one of the samples taken at the portion located directly west<br />

of the NIPP plant demonstrated a high hydrocarbon reading indicating<br />

previous hydrocarbon spillage.<br />

4.6 HYDROLOGY AND GEOHYDROLOGY<br />

4.6.1 Hydrology<br />

No streams or rivers were identified on the Project site. A small pond is<br />

located approximately 800 m to the north of the boundary of the proposed<br />

site. The neighbouring NIPP plant proposed to pump the site effluent (mainly<br />

rainwater) to this pond which then drains into Ikpoba River during the rainy<br />

season. The Ikpoba River lies approximately 4 km east from the proposed site.<br />

4.6.2 Geohydrology<br />

Groundwater sampling was undertaken during the dry season at existing<br />

boreholes located in the Ihovbor-Evboeka and Iguemokhua communities. The<br />

borehole located in the Iguemokhua community was identified to fall<br />

approximately 34 km away, it is therefore anticipated that this will not be<br />

impacted on by the Project.<br />

A second borehole was also sampled in the Ihovbor-Evboeka community<br />

during the wet season, in addition to an existing borehole in the Orior-<br />

Osemwende community. The collected samples were analysed for physicochemical<br />

properties, oil and grease, heavy metals, microbiological<br />

characteristics, and THC. In situ field analysis measurements of pH,<br />

conductivity, Total Dissolved Solids (TDS), Total Suspended Solids (TSS),<br />

Salinity, Dissolved Oxygen (DO) and temperature were taken using handheld<br />

in situ water sampling metres at the various sampling locations. Laboratory<br />

analysis was conducted on the samples by Searchgate Laboratories Limited<br />

(an FMEnv accredited laboratory) in Ifako-Gbagada, Lagos.<br />

The sampling locations of the boreholes (sampling points) are illustrated in<br />

Figure 4.4. Further details of the equipment used for sampling and latitude<br />

and longitude coordinates of the sampling locations are contained in Annex B.<br />

AZURA EDO IPP<br />

4-16<br />

DRAFT EIA REPORT