opportunity to ensure that procedures are being adhered to, and to discuss<br />

any incidents in the workplace.<br />

• Encourage the construction workforce to undergo testing (<strong>Azura</strong> <strong>Power</strong><br />

and contractors) for sexually transmitted infections (STIs).<br />

• Health awareness programme incorporating an HIV/AIDS awareness and<br />

prevention program which will include voluntary testing, the provision of<br />

condoms, and education of the workforce.<br />

• Specific H&S training programmes should be provided for workers<br />

assigned to tasks associated with particular H&S risks ie working at<br />

heights, hot work, drivers, operation of machinery or equipment with the<br />

potential to cause electrocution, those working in areas with elevated dust<br />

and noise levels. First aid training for key staff will also be provided, and<br />

include issuing of first aid certificates.<br />

• PPE shall be provided and worn at all times during construction, where<br />

required. This will depend on the type of work being conducted but will<br />

include hard hats, safety boots, hearing protection, eye protection,<br />

ventilators and visibility clothes, where appropriate.<br />

• Routine safety checks shall be carried out on the plant in line with<br />

standard safety procedures for power plants and any recommendations<br />

from the risk assessment.<br />

• Warning signs in place, including those for the electrical and mechanical<br />

equipment safety warning, and chemical hazard warning.<br />

• <strong>Azura</strong> <strong>Power</strong> shall maintain emergency and first line first aid at strategic<br />

locations through out the plant.<br />

• <strong>Azura</strong> <strong>Power</strong> will develop and shall maintain emergency and spill<br />

prevention and response/countermeasures plans for all phases of the<br />

project. This will include emergency responses to any explosions or<br />

spillages associated with the gas piping or pipeline.<br />

The HSE officer of the operating company will assume responsibility for all<br />

health and safety aspects during operation.<br />

Strict implementation of these mitigation measures and ongoing monitoring<br />

of effectiveness throughout the operation phase will reduce the likelihood to<br />

unlikely, the impact magnitude to moderate and the sensitivity of the<br />

receptors to low. With mitigation, the residual impact on workplace H&S<br />

during operation will therefore be reduced to minor.<br />

AZURA EDO IPP<br />

8-29<br />

DRAFT EIA REPORT