During operation, the major solid waste stream will be waste chemicals from<br />

the demineralisation plant and office waste including paper cardboard, glass,<br />

food wastes and cans. It is anticipated that small amounts of hazardous waste<br />

will be generated in the form of fuel oil residues, cleaning solvents and sludge<br />

from oil tanks.<br />

All solid wastes generated will be disposed of at an appropriately licensed<br />

landfill site. <strong>Azura</strong> <strong>Power</strong> will identify appropriate landfill sites during the<br />

detailed design phase.<br />

3.3 UTILITIES AND ANCILLARY SERVICES<br />

3.3.1 Electrical Systems and Transmission Line<br />

The transmission line (330 kV) will link the power plant to the Benin North<br />

Substation that is being built adjacent to the Site. The transmission line will be<br />

placed aboveground and require one pylon. Details of the additional electrical<br />

systems are described under Section 3.2.6.<br />

3.3.2 Gas Pipeline Spur<br />

The gas pipeline spur will be constructed (by the gas supplier) along the<br />

cleared existing right of way for the spur constructed for the neighbouring<br />

NIPP plant to the ELPS line. This right of way runs for 1 km along the<br />

southern boundary of the NIPP site to the ELPS pipeline. A separate spur line<br />

comprising a 1 km 18 inch pipe will be buried parallel to the existing line used<br />

for the NIPP plant and will be for the sole use of the Project.<br />

The gas supplier may also consider a route which runs a maximum of 50 m<br />

directly from the eastern corner of the Project site to the ELPS line Error!<br />

Reference source not found..<br />

3.3.3 Workshop/ Store Building<br />

A workshop/ store building will be located adjacent to the administration<br />

buildings and close to the car park (see Figure 3.1). The workshop will contain<br />

the following:<br />

• work areas with equipment eg welding unit, lathe, grinder and drilling<br />

machine;<br />

• storage areas for engine tools and spare parts;<br />

• an electrical instrument workshop;<br />

• a laboratory; and<br />

• male and female toilets, washing facilities and changing rooms.<br />

AZURA EDO IPP<br />

3-15<br />

DRAFT EIA REPORT